My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2018-12-03 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2018
>
AgdaPkt 2018-12-03 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2018 5:57:51 PM
Creation date
11/29/2018 5:35:59 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
12/3/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
256
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.C. - Page 2 of 4 <br />Construction was completed in September 2018. Three change orders were reconciled. The project has <br />been completed in accordance with the plans and specifications for a total cost of $1,147,876.56 which <br />is 4.74% more than the original bid amount. <br />FISCAL IMPACT <br />Funds for the general work of this project were approved and appropriated in the Fiscal Year 2017-2018 <br />budget as Water Fund Capital Projects — Distribution System Replacement Program which had an <br />available balance of $1,963,746.63 as of September 30, 2018. <br />ENVIRONMENTAL REVIEW <br />As the lead agency, City of Redwood City determined that the 2017-2018 Watermain Replacement <br />Project meets the California Environmental Quality Act (CEQA) exemption criteria as set forth in Section <br />15302(C) (replacement or reconstruction of existing utility system and/or facilities involving negligible or <br />no expansion of capacity). Furthermore, this project was designed compliant with the City's Engineering <br />Standards and currently accepted practices. <br />This project did not require a National Pollution Discharge Elimination System (NPDES) General Permit <br />for stormwater discharges associated with construction and land disturbances activities pursuant to <br />Attachment A.2 of Order 2010-0014-DWQwhich exempts projects to update existing lines and facilities. <br />PUBLIC NOTICE <br />Public Notification was achieved by posting the agenda, with the agenda items being listed, at least 72 <br />hours prior to the meeting <br />ALTERNATIVES <br />The City Council may choose not to accept the project or authorize the release of bonds and retention; <br />however, this would be contrary to the terms of the contract, prior Council action, and public <br />contracting code. <br />ATTACHMENTS <br />Project Location Map 2017-18 Watermain Replacement Project <br />REPORT PREPARED BY: <br />Patrick LaBruzzo, Assistant Engineer I <br />plabruzzo@redwoodcity.org <br />780-7366 <br />City of Redwood City 1017 Middlefield Road, Redwood City, CA. 94063 Tel: 650-780-7000 www.redwoodcitV.org <br />47 <br />
The URL can be used to link to this page
Your browser does not support the video tag.