My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2018-12-17 Joint Special
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2018
>
AgdaPkt 2018-12-17 Joint Special
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2018 1:26:47 PM
Creation date
12/18/2018 9:28:06 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
12/17/2018
Jump to thumbnail
< previous set
next set >
Text box
ID:
1
Creator:
Created:
12/18/2018 9:30 AM
Modified:
12/18/2018 9:30 AM
Text:
http://www.redwoodcity.org/
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
480
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.E. - Page 3 of 26 <br />potentially significant physical impact on the environment. The agreement does not obligate the City or <br />ABAG to construct the BC/AC Project. However, when the design and environmental review are <br />completed for the BC/AC Project, CEQA and NEPA consideration and action will be conducted at the <br />appropriate time and before commencing with any physical work, building on the EIS/EIR already <br />certified for the Salt Ponds Project, which analyzed the BC/AC Project under one of the Salt Ponds <br />Project alternatives. <br />PUBLIC NOTICE <br />Public notification was achieved by posting the agenda, with the agenda items being listed, at least 72 <br />hours prior to the meeting. <br />ALTERNATIVES <br />The City Council may choose to not authorize execution of the agreement amendment, which will result <br />in the City no longer being able to be obtain funding related to the Bayfront Canal and Atherton Channel <br />Project through the Proposition 84 Grant. It will then be necessary to obtain funding from other sources <br />to ensure completion of the BC/AC Project. <br />ATTACHMENTS <br />A. Amendment No. 1 (Proposed) <br />B. Local Project Sponsor Agreement (Original, Executed) <br />REPORT PREPARED BY: <br />Ahmad Haya, Senior Civil <br />ahaya@redwoodcity.org <br />780-7397 <br />APPROVED BY: <br />Aaron Aknin, Assistant City Manager and Community Development Director <br />Melissa Stevenson Diaz, City Manager <br />City of Redwood City 1017 Middlefield Road, Redwood City, CA. 94063 Tel: 650-780-7000 www.redwoodcity.ore <br />151 <br />
The URL can be used to link to this page
Your browser does not support the video tag.