My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2018-12-17 Joint Special
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2018
>
AgdaPkt 2018-12-17 Joint Special
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2018 1:26:47 PM
Creation date
12/18/2018 9:28:06 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
12/17/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
480
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.E. - Page 23 of 26 <br />Page 14 <br />8 <br />applicable. The Labor Compliance Plan will be compliant with Department of Industrial Relations <br />standards and needs to be in place prior to any construction activities covered under this grant <br />agreement. <br />Deliverables: <br />• Proof of Labor Compliance Plans for each project component <br />Task 2: Land Purchase/Easement - Budget Category (b) <br />Task 2 a) Land Purchase/Easement Acquisition <br />Not applicable. Land purchases and easements are not required for this project. <br />Task 3: Planning/Design/Engineering/Environmental Documentation - Budget Category (c) <br />Task 3 a) Assessment and Evaluation <br />This task consists of completing the planning assessment and feasibility studies prior to project <br />development. This task also includes developing the conceptual design plans and specifications. <br />Deliverables: <br />A copy of the site assessment and feasibility studies <br />A copy of the conceptual design plans and specifications <br />Task 3 b) Planning/Design/Engineering <br />This task consists of finalizing project engineering designs (90% and 100%) for the project. Finalized <br />100% design/ engineering plans and specifications will be submitted to DWR. <br />Deliverables: <br />• A copy of the100% complete design plans and specifications <br />Task 3 c) Environmental Documentation <br />This task consists of completing the required environmental compliance, completing any tribal notification, and <br />environmental documentation as necessary. <br />Deliverables: <br />• Copy of environmental documents as required by CEQA <br />Task 3 d) Permitting <br />This task consists of acquiring all identified federal, state, and local permits. Work includes <br />coordinating and complying with requirements for issuance of a permit. <br />Deliverables: <br />• Copy of all required permits <br />Task 3 e) Project Monitoring Plan <br />A Project Monitoring Plan (PMP) shall be submitted to the State prior to disbursement of grant funds <br />for construction or monitoring activities for this Project. Along with the Attachment 6 Project <br />Performance Measures Tables requirements for the Project, the PMP will also include: a) Baseline <br />conditions, b) Brief discussion of monitoring systems to be utilized, c) Methodology of monitoring, d) <br />Frequency of monitoring, and e) Location of monitoring points. <br />The LPS will lead work for monitoring and performances measures verification after Project <br />completion. <br />Deliverables: <br />• Project Monitoring Plan <br />DWR Prop 84 - Local Project Sponsor Agreement - IRWM 2 -Amendment 1 -Redwood City - [LPS Contract #C003899] <br />171 <br />
The URL can be used to link to this page
Your browser does not support the video tag.