My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2018-12-17 Joint Special
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2018
>
AgdaPkt 2018-12-17 Joint Special
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2018 1:26:47 PM
Creation date
12/18/2018 9:28:06 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
12/17/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
480
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.13. - Page 33 of 41 <br />Task 8 — Site Plan Review <br />A site access and circulation assessment will be conducted for vehicles, bicycles, and <br />pedestrians within the Project site and on the adjacent roadways. To the extent <br />adequate detail can be provided, consultant will review the site plan for: <br />• Site access and interface with roadway network including corner sight distances <br />and a review of driveway spacing <br />• Queueing at intersections and potential spillback <br />• Emergency vehicle access and circulation <br />• Vehicular circulation and roadway sizing within the site <br />• Pedestrian access and circulation within and adjacent to the site <br />• Bicycle access and circulation within and adjacent to the site <br />• Transit access adjacent to the site <br />• Pedestrian access to and from nearby transit stops <br />• Parking supply in comparison to City Code requirements and ITE parking demand <br />Intersection level of service calculations will be conducted for the 6 internal intersections <br />using Cumulative With Project volumes to assess their operations with full buildout of <br />the project. <br />Task 9 — TDM Program Analysis <br />Projects generating more than 100 peak hour vehicle trips are subject to Transportation <br />Demand Management (TDM) requirements set forth by the San Mateo C/CAG. <br />Consultant will develop an outline of applicable TDM Strategies for conformance to <br />C/CAG Guidelines and recommend additional measures, if applicable. <br />Task 10 — VMT Analysis <br />A VMT analysis will be conducted by applying average trip lengths to the vehicle trips <br />generated by the project. <br />Task 11— Documentation <br />Consultant will prepare a TIA report of that will include text, graphics, and tables to <br />describe the analysis methods and results, potential transportation impacts, and <br />corresponding mitigation measures. Consultant will submit the Administrative Draft <br />TIA in electronic format for review by the City and the environmental consultant. This <br />scope includes up to 20 staff hours to respond to all comments on the Administrative <br />Draft TIA report and prepare the Draft TIA report to be included in the EIR. <br />Page 29 of 37 <br />ATTY/AGR/2018.270/AECOM PSA <br />REV: 12-07-18 PR <br />X <br />
The URL can be used to link to this page
Your browser does not support the video tag.