Laserfiche WebLink
EXHIBIT "A" <br />SCOPE OF SERVICES <br />Consultant shall design the improvements listed below for a not -to -exceed amount of <br />$157,020. As specified in Task 8, additional work may be authorized by the City <br />Manager with prior written approval for a total not -to -exceed amount of $172,722. <br />City of Redwood City <br />Neighborhood Street Enhancement Project <br />No. <br />Locations <br />Location Description <br />Improvement Description <br />Jurisdiction <br />M <br />1 <br />FA -T5/ <br />Bay Rd and Eighth Ave <br />RRFB and High Visibility Crosswalk <br />County/City <br />M <br />NFO -T10 <br />Intersection <br />M <br />r <br />2 <br />FA -T7/ <br />Bay Road at Tenth Ave <br />RRFB at Crosswalk <br />County/City <br />NFO -T11 <br />3 <br />FA -T2 <br />Fifth Ave and Page St intersection <br />Bulb -outs /Green Infrastructure <br />City <br />N <br />4 <br />FA -T6 <br />Page Street and Eighth Ave <br />Bulb -outs (4 Corners) and High <br />City <br />T <br />Intersection <br />Visibility Crosswalk <br />Page Street and Tenth Ave <br />Bulb -outs (4 Corners) and High <br />5 <br />FA -T8 <br />Intersection <br />Visibility Crosswalk <br />city <br />LL <br />6 <br />FA -T13 <br />Florence St and Seventeenth Ave <br />RRFB at Crosswalk <br />City <br />Fair Oaks Ave and Second Ave <br />New High Visibility Crosswalk and <br />�e <br />o <br />7 <br />NFO -T6 <br />Intersection <br />Bulb -outs <br />County <br />Second Ave between Northside <br />LL <br />8 <br />NFO -S1 <br />Ave and Spring St <br />Lane Narrowing <br />County <br />s <br />09 <br />Spring St between Fifth Ave and <br />NFO -S2 <br />Bay Rd <br />Lane Narrowing <br />County <br />10 <br />RV -Tl <br />Middlefield Rd between <br />Signal Coordination <br />County/City <br />Woodside Rd and Douglas Ave <br />11 <br />RV -T8 <br />Spring St and Flynn Ave <br />High Visibility Crosswalks <br />County/City <br />Intersection <br />v <br />Spring St and Flynn Ave <br />RRF at Crosswalks (Modified Bulb - <br />0 <br />12 <br />RV -T9 <br />outs (2 corners) and High Visibility <br />County/City <br />3 <br />Intersection <br />Crosswalk) <br />V <br />13 <br />RV -T13 <br />Flynn Ave and Scott Ave <br />Curb Extension <br />City <br />14 <br />RV -T14 <br />Scott Ave between Flynn Ave and <br />Speed Lump <br />City <br />Burbank Ave <br />REV: 11-01-18 PR <br />Page 10 of 17 <br />ATTY/AGR.2018.248/CSG Consultants, Inc. <br />