My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt18 CSG Consultants, Inc. NSEPP
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2018
>
Agmt18 CSG Consultants, Inc. NSEPP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2019 10:26:09 AM
Creation date
1/3/2019 1:23:21 PM
Metadata
Fields
Template:
Agreement
Contractor Name
CSG Consultants, Inc.
PROJECT NAME
PSA Neighborhood Street Enhancement Program
RMP File Number
304
Date
11/29/2018
MO Ref
18-220
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Task 3 - 90% Design Submittal <br />$15,702 <br />Review and Response <br />to Preliminary Design <br />4 <br />4 <br />$660 <br />$660 <br />Comments <br />Prepare <br />Underground Utility <br />4 <br />4 <br />$660 <br />$660 <br />Mapping <br />SRTS&GI <br />2 <br />40 <br />52 <br />94 <br />$13,730 <br />$13,730 <br />Infrustructure Plans <br />Prepare 90% Design <br />Plans, Specs & <br />4 <br />104 <br />104 <br />212 <br />$31,420 <br />$4,909 <br />$36,329 <br />Estimates <br />Subtotal -Task 3 <br />6 <br />0 <br />152 <br />156 <br />0 <br />314 <br />$46,470 <br />$0 <br />$0 <br />$4,909 <br />$51,379 <br />Task 4&5 - Final Design (100% Design Submittal) <br />Review and Response <br />to 90%PS&E <br />1 <br />1 <br />$165 <br />$165 <br />Comments <br />Prepare 100%PS&E 4 <br />40 <br />52 96 <br />$14,100 <br />$2,945 <br />$17,045 <br />Subtotal - Task 4&5 4 0 <br />41 <br />52 0 97 <br />$14,265 <br />$0 <br />$0 <br />$2,945 <br />$17,210 <br />Task 6 - Construction Engineering/Support <br />Attend Pre-bid <br />assistance and <br />3 <br />3 <br />6 <br />$1,050 <br />$1,050 <br />sup rt <br />Attend Pre- <br />2 <br />2 <br />4 <br />$700 <br />$700 <br />Construction Meeting <br />Prepare Conform Set <br />4 <br />4 <br />$660 <br />$660 <br />Drawing <br />Review and Approve <br />Shop <br />4 <br />4 <br />$660 <br />$660 <br />Drawing/Submittal <br />Response to Request <br />4 <br />4 <br />$660 <br />$660 <br />for Information(RFls) <br />Attend Field <br />Visit/Meeting (2 <br />6 <br />6 <br />12 <br />$2,100 <br />$2,100 <br />vistt/meeting) <br />Prepare Record Se[ <br />8 <br />4 <br />12 <br />$1,840 <br />$1,840 <br />Drawing <br />Subtotal - Task 6 <br />11 <br />0 <br />31 <br />4 <br />0 <br />46 <br />$7,670 <br />$0 <br />$0 <br />$0 <br />$7,670 <br />Task 7- Potholing <br />Potholing (4) <br />4 <br />$660 <br />$3,990 <br />$4,650 <br />Subtotal -Task7 <br />0 <br />0 <br />4 <br />0 <br />0 <br />0 <br />$660 <br />$0 <br />$3,990 <br />$0 <br />$4,650 <br />TOTAL <br />$121,090 <br />$21,462 <br />$3,990 <br />$9,818 <br />$157,020 <br />(Optional) Task 8 -Additional Work <br />$15,702 <br />This task require prior written approval of the City Manager <br />REV: 11-01-18 PR <br />Page 17 of 17 <br />ATTY/AGR.2018.248/CSG Consultants, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.