My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt06 Zeiger Engineers
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2006
>
Agmt06 Under $60K
>
Agmt06 Zeiger Engineers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/2/2008 3:32:11 PM
Creation date
5/4/2006 3:32:45 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Zeiger Engineers
PROJECT NAME
electrical engineering consulting
RMP File Number
304.5
Date
5/3/2006
Box
6586
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />site investigations of the existing conditions <br />provide design for new building to house the pump station switchgear (whether it <br />be new or relocated) with required lighting and power requirements <br />electrical specifications and drawings <br />office consultation during construction <br />cost estimates for the final approved drawings <br /> <br />Architectural work shall include: <br />Provide Architectural drawing for a building to house the switchgear. The <br />building is a concrete block structure approximately 8' x 10' x 9' high with <br />painted finish on the exterior and flat built-up roof for a water-tight enclosure. <br />Access is via one hollow metal man door. Structure will be naturally ventilated <br />with louvers. <br />Fee is for architectural and structural engineering design only. Excludes <br />mechanical, surveying, civil, geotechnical, landscape and other design. Fee also <br />excludes any agency design review for presentation and public hearings <br />cost estimates for the final approved drawings <br /> <br />Additional Services, work not included in our Basic Services, shall include, but is not <br />necessarily limited to: <br /> <br />l. <br />2. <br /> <br />site observationslinspections during construction <br />co-ordination meetings with the city beyond the basic scope of two meetings <br /> <br />Should you have any questions, or require any additional information on our proposal, <br />please do not hesitate to call me. <br /> <br />Sincerely, <br /> <br />ZEIGER ENGINEERS, INC. <br /> <br />~JL <br /> <br />Oscar T. Louie, PE <br />Vice President <br />
The URL can be used to link to this page
Your browser does not support the video tag.