My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2019-01-14 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2019
>
AgdaPkt 2019-01-14 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 1:02:35 PM
Creation date
1/10/2019 5:38:03 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
1/14/2019
Jump to thumbnail
< previous set
next set >
Text box
ID:
1
Creator:
Created:
1/10/2019 5:39 PM
Modified:
1/10/2019 5:39 PM
Text:
http://www.redwoodcity.org/
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
276
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.D. - Page 3 of 5 <br />signature page of Addendum No. 1 separately acknowledging that document, but this minor irregularity <br />can be waived by the City Council. Based on the bids received and the circumstances of Addendum No. <br />1, staff believes that the low bid is reasonable and responsive and recommends waiving the irregularity <br />and awarding the contract to Fieldturf USA, Inc. <br />Construction is expected to begin at the beginning of February, 2019, and conclude within 60 calendar <br />days. The City will give notice to all residents, businesses, and community organizations who might be <br />affected by the construction. Additionally, the contractor is obligated to notice area residents and <br />businesses two weeks prior to the start of work. Signage that contains project information will be posted <br />at the construction site and construction updates will be available on the City's website. <br />FISCAL IMPACT <br />Funding for this project was approved through City of Redwood City's adopted FY 2018-2019 Capital <br />Improvement Projects and Park Impact Fees Synthetic Play Fields Conversion fund. <br />ENVIRONMENTAL REVIEW <br />As the lead agency, City of Redwood City has determined that the Hoover Field Synthetic Turf <br />Replacement Project meets the California Environmental Quality Act (CEQA) exemption criteria as set <br />forth in Section 15301, "Existing Facilities," because the project would repair subsurface stabilization <br />and drainage problems with the replacement of existing synthetic turf with similar materials. The Project <br />would not expand the use of the playfields to be repaired. Furthermore, this project is designed to be <br />compliant with the City's Engineering Standards and currently accepted practices. <br />PUBLIC NOTICE <br />Public Notification was achieved by posting the agenda, with the agenda items being listed, at least 72 <br />hours prior to the meeting. <br />ALTERNATIVES <br />The City Council may choose not to award the contract and direct staff to redesign and/or rebid this <br />project. The Council also may choose not to award one or both of the bid alternate items. Given the <br />current condition of the fields, a time delay could increase the likelihood of a failure to the field, <br />impacting soccer, baseball, softball, football, and other field sports. <br />ATTACHMENTS <br />Attachment A: Project Location Map <br />REPORT PREPARED BY: <br />City of Redwood City 1017 Middlefield Road, Redwood City, CA. 94063 Tel: 650-780-7000 www.redwoodcity.ore <br />70 <br />
The URL can be used to link to this page
Your browser does not support the video tag.