My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt19 Aecom Technical Services, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2019
>
Agmt19 Aecom Technical Services, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2020 12:15:28 PM
Creation date
1/25/2019 12:09:05 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Aecom Technical Services, Inc
PROJECT NAME
Environmental consulting 1601 ECR
RMP File Number
304
Date
1/9/2019
MO Ref
18-237
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Exhibit "A" <br />SCOPE OF SERVICES AND FEE <br />Scope of Work <br />AECOM will provide the following scope of work to update the working draft Environmental <br />Impact Report to describe and analyze recent revisions to the proposed project located at 1601 <br />EI Camino Real (South Main Street Mixed -Use Project). This scope of work is based on the <br />following general understanding of the revised project, as reflected on the preliminary designs <br />dated October 25, 2019: <br />Addition of 249 residential units <br />Reduction in commercial space of approximately 19,000 square feet <br />Reduction of 123 parking spaces provided for office uses <br />With the offsite development of 39 residential units on Parcel F at 1304 EI Camino Real, the <br />revised project currently includes a total of 540 residential units and approximately 560,000 <br />square feet of commercial space, comprised primarily of about 530,000 square feet of office use. <br />The additional 249 residential units are proposed for construction on Parcel D. Commercial space <br />previously proposed on Parcel D would be partially shifted to Parcels C and E, resulting in a total <br />increase of approximately 91,000 square feet on these two parcels. No changes are proposed on <br />Parcels A and B. <br />The following project tasks will be augmented as described below to address the revised project. <br />These augmented services will be provided in addition to, and in accordance with, the current <br />scope of work dated January 9, 2019 and as amended on August 19, 2019. <br />Task 1: Project Description <br />AECOM will update the EIR Project Description based on the information provided by the project <br />applicant. A list of information needs will be developed and requested from the applicant to ensure <br />that the revised project description provides the same level of detail as that provided for the prior <br />project. AECOM will produce a draft and final project description to be integrated into the <br />Administrative Draft EIR. No substantive changes to the Initial Study analysis and conclusions <br />are warranted as a result of the project revisions; however, AECOM will prepare a sub -section in <br />the EIR summarizing the project changes and documenting why the prior Initial <br />Study conclusions remain valid. <br />Task 4.1: Revised Administrative Draft EIR <br />In addition to the EIR project description, the following impact sections of the EIR will be updated: <br />- Aesthetics <br />- Air Quality / Health Risks <br />- Transportation <br />- Introduction <br />o Project Overview (e.g., describe process leading to revised project) <br />o EIR Scope: substantiation of the applicability of the Initial Study analysis to the <br />revised project, including a summary table that updates the quantifiable effects of <br />the project (e.g., population, housing, and employment, water demand, etc.) <br />REV: 01-23-20 PR <br />ATTY/AGR.Amend. No.2/AECOM (Page 3 of 6) <br />
The URL can be used to link to this page
Your browser does not support the video tag.