To accurately account for the impacts associated with the revised project, the supporting technical <br />studies currently in -progress will be updated, as detailed under Task 7 and Task 9 below. <br />This task also includes delivery of a draft and final NOP that will describe the revised project <br />characteristics and the context for the project revisions. Publication of the NOP will serve to <br />update the public and public agencies regarding the current project status. <br />Task 5: Final EIR <br />Due to the increase in the scale of the project, additional scrutiny of the Draft EIR analysis is <br />anticipated. AECOM will augment this task to address any additional Draft EIR comments that <br />are received as a result of the proposed increase in development intensity. The task would <br />specifically amend the current scope of work that provides for written responses to up to 35 <br />discrete Draft EIR comments by increasing that number to up to 55 comments. <br />Task 6: Project Management and Meetings <br />Additional resources would be applied to the direction and management of staff engaged in the <br />analysis of the revised project. Due to the necessity of extending the schedule to address the <br />project revisions, this task also includes additional meetings and communications with Redwood <br />City staff and the project applicant to ensure an accurate project understanding, provide regular <br />status updates, identify necessary action items, and convey project details to technical staff <br />engaged on the project analysis. <br />Task 7: Transportation Studies <br />Transportation and Circulation: Consultant will update the ongoing Transportation <br />Impact Study (TIA) and the analysis of vehicle mile traveled (VMT) to reflect the revised project <br />characteristics. This augmented task also includes the addition of four study area intersections, <br />as requested by Redwood City staff in response to comments received on the Notice of <br />Preparation. A detailed scope of work and budget breakdown is provided in Attachment 1. <br />Task 9: Technical Studies <br />The technical analysis and reports described below are currently in -progress, but will be updated <br />to reflect the revised project in accordance with the current scope of work. These updated reports <br />will be prepared in accordance with the approach and methodologies described in the previously <br />approved scope of work. <br />Air Quality Report (health risk assessment and criteria pollutants): the preliminary <br />health risk assessment (HRA), and the analysis of criteria air pollutants, toxic air <br />contaminant (TAC) and greenhouse gas (GHG) emission impacts currently underway will <br />be revised to reflect the revised project characteristics. Due to the increased intensity of <br />construction activity that would occur under the revised project, and the associated <br />increase in air quality/health risks impacts, this scope of work includes two additional <br />iterations of the air quality modeling to refine the construction activity assumptions and <br />inputs and refine the mitigation scenarios. <br />• Shadow Study: the shadow diagrams will be updated to reflect the increased building <br />massing under the revised project to show the resulting shadow patterns that would result <br />on adjacent properties. This task includes an updated report providing text analysis of the <br />anticipated effects on adjacent land uses. <br />Optional Tasks <br />REV: 01-23-20 PR <br />ATN/AGR.Amend. No.2/AECOM (Page 4 of 6) <br />