Laserfiche WebLink
6.D. - Page 14 of 22 <br />Disney Construction Inc. <br />BASE BID SCHEDULE: CALIFORNIA WATER TANK, PUMP STATION AND TRANSMISSION <br />MAIN PROJECT <br />Item <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Item Cost <br />24 <br />Residual Control System <br />1 <br />LS <br />20 coc <br />o <br />Z pay <br />22 <br />1 Landscape Irrigation <br />1 <br />LS <br />3� <br />c�0o <br />23 <br />Landscape Planting <br />I <br />LS <br />S� 1000 <br />5C 66 0 <br />24 <br />Landscape Maintenance <br />90 <br />DAYa <br />TOTAL. BASE BID SCHEDULE (ITEMS 1 THROUGH 24) <br />VSC�a <br />�n�`� 5 <br />r <br />n l ve cj- Se -c- +I'c vx <br />BIC FORMS <br />CALIFORNIA WATER TANK, PUMP STATION & TRANSMISSION MAIN PROJECT <br />8/C�2.L 300 <br />O0 200 <br />101 <br />