Laserfiche WebLink
6.D. - Page 15 of 22 <br />Disney Construction Inc. <br />ADDITIVE ALTERNATE NO.1 BID SCHEDULE: HDPE WATER TRANSMISSION LINE AND <br />APPURTENANCES* <br />Item <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Item Cost <br />Mobilization, Demobilization, Traffic <br />t S 1 o0 o <br />ISO oDp <br />Control, Construction Layout, <br />I <br />Notification & Incidentals (Maximum <br />1 <br />LSA <br />a o <br />5% of the Total Additive Alternate <br />No. 1 Bid, Items 1 through 12 <br />Sheeting, shoring and bracing for all <br />2 <br />trenching and excavation work in <br />1 <br />LS <br />accordance with California Labor Code <br />1 Q <br />16 o 0o <br />Section 6707. <br />10040 <br />3 <br />Water Main -12-inch DR 11 IPS HDPE <br />900 <br />LF <br />Pipe <br />4 <br />Butterfly Valve-124nch <br />3 <br />EA <br />00 <br />Z -� 0 0 <br />5 <br />Gate Valve - 6 -inch <br />2 <br />EA <br />00 <br />00 <br />6 <br />Comb. Air Valve w/Enclosure -2-inch <br />2 <br />EA <br />0G0 <br />000 <br />7 <br />Comb_ Air Valve w/Enclosure-14nch <br />1 <br />EA <br />8 <br />Blow Off - 2 -inch <br />1 <br />EA <br />[ coo <br />0 0 G <br />9 <br />Thrust Block for HDPE Pipe <br />8 <br />EA <br />1 u <br />0 C36 <br />10 <br />Trench Stabilizer (RWC Std W-19) <br />10 <br />EA <br />t Z J <br />20 <br />11 <br />Pipeline Connection, Sta. 10+00 <br />1 <br />LS <br />O <br />ia <br />(' C54 <br />12 <br />Communication Conduit and <br />940 <br />LF <br />Appurtenances <br />TOTAL ADDITIVE ALTERNATE NO. I BID SCHEDULE <br />$ Z oa d <br />ITEMS 1 THROUGH 12) ($) <br />* SEE DRAWINGS C-2, C-10, C-11, AND C-12 FOR WORK DELINIATION <br />BID FORMS 004001 <br />CALIFORNIA WATER TANK, PUMP STATION & TRANSMISSION MAIN PROJECT <br />102 <br />