My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2019-02-11 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2019
>
AgdaPkt 2019-02-11 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/2/2020 10:30:18 AM
Creation date
2/7/2019 5:10:32 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
2/11/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
679
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.D. - Page 16 of 22 <br />Disney Construction Inc. <br />ADDITIVE ALTERNATE NO.2 BID SCHEDULE: CALIFORNIA WAY - JEFFERSON AVENUE <br />WATER TRANSMISSION MAIN** <br />Item <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Item Cost <br />Mobilization, Demobilization, Traffic <br />Control, Construction Layout, <br />1 <br />Notification & Incidentals (Maximum <br />1 <br />LS <br />2 0/ 0o d <br />Zoj 00 0 <br />5% of the Total Additive Alternate <br />No. 2 Bid, Items 1 through 13 <br />Sheeting, shoring and bracing for all <br />2 <br />trenching and excavation work in <br />1 <br />LS <br />accordance with California Labor Code <br />1�5 a o 0 <br />1 S a o a <br />Section 6707. <br />r <br />3 <br />Water Main - 12" PVC Pipe <br />2001 <br />LF <br />12,50 <br />5 0 0) 25 O <br />4 <br />Water Main - 8" PUC Pipe <br />49 <br />LF <br />6,5-0 <br />31 0650 <br />5 <br />12" Butterfly Valve <br />10 <br />EA <br />l 000 <br />l `' o c o <br />6 <br />8" Gate Valve <br />2 <br />EA <br />QED <br />L (cO6 <br />7 <br />Type A Fire Hydrant <br />4 <br />EA <br />8 <br />2" Polyethylene Water Service and <br />1 <br />EA <br />Connection to Existing 8" Pipe <br />000 <br />9 <br />8" Connection to Existing 8" Watermain <br />3 <br />EA <br />l C �; <br />.500 <br />10 <br />2" Combination Air Release Valve <br />Assembly <br />3 <br />EA <br />S O <br />a O <br />11 <br />12" x 16" Tapping Sleeve and Valve <br />1 <br />EA <br />u OG <br />ct D d p <br />12 <br />Drainage Improvements <br />1 <br />LS <br />2-0 p 0 v <br />-zy Uejb <br />13 <br />250 -Gal. Bladder Surge Tank <br />1 <br />LS <br />to 0 0 L <br />Q} O (c] C <br />TOTAL ADDITIVE ALTERNATE NO. Z BID SC EDULE <br />-P-I 5 -+00 <br />ITEMS 1 THROUGH 13 <br />� <br />** SEE CALIFORNIA WAY -JEFFERSON AVENUE WATER TRANSMISSION LINE PLANS <br />BID FORMS CALIFORNIA WATER TANK, PUMP STATION & TRANSMISSION MAIN PROJECT ReOt1 ised per Add103 <br />
The URL can be used to link to this page
Your browser does not support the video tag.