7.C. - Page 5 of 11 <br />Project Alternatives. The Draft EIR evaluates the proposed project against six alternatives, summarized <br />below. Of these, the "No Project — Existing Zoning" and "No Project -Existing General Plan Alternative" are <br />the environmentally superior alternatives as they both reduce peak -hour traffic trips. However, since they <br />are both considered "No Project" alternatives, CEQA requires another alternative to be identified. The <br />"Reduced Buildout and Height Alternative" is considered the CEQA-required environmentally superior <br />alternative. Compared to the proposed project, the Reduced Buildout and Height Alternative would have <br />the greatest reduction in environmental effects. <br />1. No Project - Existing General Plan (light industrial/building materials use). This alternative <br />represents development that could likely occur on the site pursuant to the natural course of <br />growth under the existing Redwood City General Plan: 884,704 square feet of light industrial and <br />building materials uses. <br />2. No Project - Existing Zoning (70/30 Research and Development Lab and Ancillary R&D office). <br />This alternative represents development that could likely occur on the site pursuant to the natural <br />course of growth under the existing IR zoning designation to the extent currently allowed by the <br />General Plan: development of 70% R&D Laboratory (578,076 square feet) and 30% R&D Office <br />(247,747 square feet). <br />3. Reduced Buildout and Building Height. This alternative represents development of <br />approximately 67% of the square footage of the proposed project, with reduced building heights: <br />788,150 square feet of office. <br />4. 70/30 Office plus Ancillary R&D Lab. This alternative represents development that allows more <br />square footage of regular office use (70%) combined with less R&D Lab use (30%) than is allowed <br />by the existing IR zoning designation: total floor area of 1,179,748 of mixed offices and R&D uses. <br />5. Alternative Site Location. This alternative would develop the proposed project development, but <br />at a location within Redwood City other than the proposed project site. The analysis assumes a <br />location within the Seaport Boulevard corridor given the lack of feasible sites elsewhere in the <br />City <br />6. On-site public amenities. This alternative responds to comments received during scoping of the <br />EIR. This alternative represents development similar to the Project, except with three office <br />buildings (instead of four) to accommodate a range of one to four publicly -accessible, adult soccer <br />fields onsite on one to four acres of the site. <br />Statement of Overriding Considerations. CEQA guidelines (section 15043) provides public agencies the <br />authority to approve projects even though the project would cause a significant effect on the <br />environment if the agency makes a fully informed and publicly disclosed decision that: <br />a. There is no feasible way to lessen or avoid the significant effect; and <br />b. Specifically identified expected public benefits from the project outweigh the significant <br />environmental impacts of the project. <br />The term "public benefits" is not defined, however, it generally is considered the intrinsic value of the <br />development itself and/or the value of any special benefits that the developer is proposing in conjunction <br />City of Redwood City 1017 Middlefield Road, Redwood City, CA. 94063 Tel: 650-780-7000 www.redwoodcity.ore <br />232 <br />