Laserfiche WebLink
5_ Alternatives <br />TABLE 5-2 <br />IMPACT COMPARISON OF THE PROJECT ALTERNATIVES <br />1 Lightrglare from newas-needed recreational lighting <br />2 Exposure of sensitiMe receptors to TACs <br />3 Land Use Naise Campatibility <br />NOTES: Impacts shown for mos severe impact under each <br />errviranmenta I topic. <br />LS Less than significant; no mitigation required <br />LSM Less than significant impact after implementation of all <br />feasible mitgatan measures <br />SU Significant and Unavoidable after implementation of all <br />feasible mitgatan measures <br />irh Impact m mare severe (4) ar less severelreduced (A) <br />than the Project impact, but with no change in impact <br />determinatan- <br />Bold means the impact determination differs from the Project <br />impact. <br />Shading means the degree of impact is substantially <br />different from the proposed Project impact. <br />Proposed <br />Project <br />No Project - <br />Existing General <br />Plan; <br />Lighr fndusrrW <br />Budding Mareriais <br />No Project - <br />Existing Zoning: <br />70130 R&D Lab + <br />Ancilfary R&D Office <br />Reduced Buildout <br />and Building <br />Height <br />70134 Office + <br />Ancillary R&D Lab <br />Alternative Site <br />Location <br />Onsite Public <br />Amenities <br />4.1 Aesthetics <br />LS <br />LS n <br />LS4 <br />LS- <br />LS <br />L5 <br />LSM 1 <br />4.2 Air Quality(Construction) <br />LSM <br />Lsw <br />LSM# <br />LSM# <br />LSM <br />LSM <br />LSMJ <br />Air Quality (Operations) <br />LS <br />LSb <br />LS# <br />LS# <br />LS <br />LS <br />LSM 2 <br />4-3 Biological Resources <br />LSM <br />LSM <br />LSM <br />LSM <br />LSM <br />LSM <br />LSM <br />4.4 Cultural f Tribal Resources <br />LSM <br />LSM <br />LSM <br />LSM <br />LSM <br />LSM <br />LSM <br />4.5 Geology and Soils <br />LS <br />LS <br />LS <br />LS <br />LS <br />LS <br />L5 <br />W ---b <br />m6ffi6useGases f ClimateLS <br />LSM <br />LSU <br />LS <br />LS <br />LS <br />LS <br />Chan e <br />4-7 Hazards Hazardous Materials <br />LSM <br />LSM <br />LSM <br />LSM <br />LSM <br />LSM <br />LSM <br />4-8 Hydrology and Water Quality <br />LSM <br />LSW <br />LSM# <br />LSM <br />LSM <br />LSM <br />LSM4 <br />4-9 Land Use and Planning <br />LS <br />LS <br />LS <br />LS <br />LS <br />LS <br />LS <br />4-10 Noise (Construction) <br />LSM <br />LSM I' <br />LSM# <br />LSM# <br />LSM <br />L5M <br />LSW <br />Noise (Operations) <br />LS <br />LW <br />LS# <br />L5# <br />LS <br />LS <br />LS'5 i LSM3 <br />------------------ ---------------------------- <br />4-11 Papulation, Housing and <br />---------------------- <br />LS <br />------------------------------------- <br />LSA <br />--------------------------------------- <br />LS# <br />------------------------------------- <br />LSIr <br />-------------------------------------- <br />L5 <br />-------------------------------------- <br />LS <br />-------------------------------------------- <br />LS#i <br />Employment <br />4-12 Public Services i Recreation <br />LS <br />LSA <br />LS# <br />Ls4 <br />L5 <br />LS <br />LS{i <br />4.13 Utilities 1 Service Systems <br />LS <br />LStb <br />LS# <br />LSn <br />LS <br />LS <br />LSd <br />4-14 Transportation f Circulation <br />SU <br />SU4 <br />sw <br />SU# <br />sU <br />SU <br />SUS <br />1 Lightrglare from newas-needed recreational lighting <br />2 Exposure of sensitiMe receptors to TACs <br />3 Land Use Naise Campatibility <br />NOTES: Impacts shown for mos severe impact under each <br />errviranmenta I topic. <br />LS Less than significant; no mitigation required <br />LSM Less than significant impact after implementation of all <br />feasible mitgatan measures <br />SU Significant and Unavoidable after implementation of all <br />feasible mitgatan measures <br />irh Impact m mare severe (4) ar less severelreduced (A) <br />than the Project impact, but with no change in impact <br />determinatan- <br />Bold means the impact determination differs from the Project <br />impact. <br />Shading means the degree of impact is substantially <br />different from the proposed Project impact. <br />