Laserfiche WebLink
<br /> CATALYfT <br /> Zack, Downtown Redwood City Connective Elements, 26 October 2004, page 3 of 5 <br /> I. Prepare Base Maps (fee: $2,500) <br /> Working from aerial photography or GIS-based maps provided by you we will prepare base maps <br /> at multiple scales: <br /> _ the downtown in regional context, showing connections from 1-280 and US lOt <br /> _ the downtown core area, showing street connections, pedestrian ways, public <br /> <. <br /> parking areas and key destinations <br /> - a plan enlargement ofTbeater Way from Broadway to Veterans <br /> _ a plan enlargement of the block of Broadway/Jefferson/Main enclosing the public <br /> parking lot <br /> The first two maps will be key to developing the way finding and sign program. The second two <br /> will be used for specific streetscape and other connective elements. <br /> 2. Schematic Design <br /> a. Wayfinding Diagram and Sign Strategy (fee: $3,500) <br /> We will diagram key access routes and way finding decision points. We will identify the location <br /> and character of needed directional information. We will describe an overall sign strategy with <br /> examples showing how other communities have met similar needs. <br /> b. Alternatives for Theater Way and Broadway/Jefferson/Main Parking lot (fee: $3,000) <br /> The Wayflnding Diagram and Sign Strategy will be integrated with more detailed design <br /> alternatives for the two identified key focus areas. The design alternatives will identify specific <br /> intelVentions in these areas such as curb cuts/repair, sidewalk enhancements, signs, lighting, <br /> street trees, fac;ade improvements, etc. <br /> 3. Meeting with Stajf(fee: $1,250) <br /> We will meet with you to present the Wayfinding Diagram and Sign Strategy and Schematic <br /> Design Alternatives for Theater Way and Broadway/Jefferson/Main Parking Lot. The purpose of <br /> the meeting will be to confirm the overall direction and select a preferred alternative for each of <br /> the elements for further development. <br /> 4. Design Development. <br /> a. Wayfinding and Signs (fee: $10,000 Dot including sign mock-up) <br /> Worlring with VKK, we will develop schematic designs for signs and wayfinding elements. <br /> These designs will specify material, layout, typography, mounting, and location for each of the <br /> _....~..." . ____..._M___ . _.._u_,__.. _.,. ~._~".,_,__._.._ __ _ .~" ~.._-~._~ <br />