My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt06 Catalyst
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2006
>
Agmt06 Catalyst
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/18/2006 8:38:07 AM
Creation date
5/30/2006 11:02:08 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Catalyst
PROJECT NAME
landscape architecture & urban design services
RMP File Number
304
Date
1/21/2005
MO Ref
RD-06-005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> CATALYfT <br /> Zack, Downtown Redwood City Connective Elements, 26 October 2004, page 4 of 5 <br /> family of signs and wayfinding elements. Using photosimulation, we will illustrate each of these <br /> elements in a typical downtown location. We will also prepare a representative mock-up of the <br /> proposed sign for presentation and review (cost of mock-up an additional fee to be determined <br /> depending on materials, etc.). <br /> t;,; <br /> b. Alternatives for Theater Way and Broadway/Jefferson/Main Parking lot (fee: $5,000) <br /> .' <br /> We will develop the selected design for Theater Way improvements from Broadway to Veterans <br /> and the Broadway/JetTersonIMain Parking Lot. The design development drawings will document <br /> selected interventions in greater detail and specificity. <br /> 5. Meeting with StajJ(fee: $1,250) <br /> We will meet with you to present the more developed designs for Wayfinding and Sign and <br /> Theater Way and Broadway/Jefferson/Main Parking Lot. The purpose of the meeting will be to <br /> review the designs and prepare for the next step. <br /> 6. Architectural Review Committee (ARC) presentation (fee: $2,SOOr-optional <br /> The Wayfinding and Sign Program will be highly visible and will contribute to the overall <br /> identity of Redwood City. For this reason, it may be advisable to present it to the ARC. In this <br /> task, we will prepare for and present the program to the ARC, using illustrations and <br /> photo simulations to show how the program will integrate into the downtown. <br /> 7. Prepare Bid Documents <br /> The level of effort for preparation of bid documents will depend on several factors that cannot be <br /> assessed at this time. We propose to negotiate this phase of the work at a later time, once the <br /> scope of the intervention and the method of contracting are more clearly known. The scope of <br /> work may also require subconsultants, such as civil or electrical engineers, who can be added to <br /> the team at this time. <br /> a. WaY.finding and Signs <br /> Bid documents will likely include drawings and specifications for the following elements: <br /> - intersection signs at Veteran's/Woodside, Woodside/Broadway, and <br /> Veteran'slWhipple intersections. <br /> - Secondary Gateways (signs or markers) indicating entry to the downtown core at up <br /> to six locations <br /> -. . ." ....__....._.~,._.._. ." "_'-'.___"'_...u _, ..._.._.. __. .. _~..._~_ <br />
The URL can be used to link to this page
Your browser does not support the video tag.