My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt19 Donald M. Duggan dba Skyrak Engineering Services
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2019
>
Under 60K
>
Agmt19 Donald M. Duggan dba Skyrak Engineering Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2019 9:33:16 AM
Creation date
2/25/2019 9:33:06 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Donald M. Duggan dba Skyrak Engineering Services
PROJECT NAME
Seismic Upgrade of Peninsula Tank No. 2 updae and completition of design seervices and cosultant services during bid
RMP File Number
304.5
Date
2/21/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT B <br />Consultant shall perform the work based on the hourly rates below and provide the materials necessary to deliver the <br />work. <br />Peninsula Tank No. 2 <br />Cost to Complete Project Documents (from 90% to 100%) <br />And Consulting Services During Bid and Construction <br />Labor <br />Not to Exceed <br />Hours <br />Cost <br />DLH <br />DMD <br />Rate: <br />$210.00 <br />$ 225.00 <br />1.0 Task 1 - Develop Bid Package <br />4 <br />1.1 Internal Review -ensure all previous comments are <br />adequately addressed <br />24 <br />1.2 External (Piling Contractors) Constmctability, Investigation and <br />1 <br />revise drawings <br />8 <br />12 <br />$ 2,640,00 <br />1.3 Update Construction Cost Estimate <br />1.4 Submit Final PS & E Package to RWC. Drawings only, City <br />24 <br />48 <br />$ 10,440.0 <br />will prepare bid package using 95% tech specs already submitted. <br />4 <br />5 <br />$ 1,110.00 <br />Bid Process conducted by RWC <br />8 <br />8 <br />$ 1,800.00 <br />8 <br />8 <br />$ 1,800.00 <br />Not to Exceed Cost for Task 1 <br />29 <br />52 <br />81 <br />$ 17,790.00 <br />2.0 Task 2 - Consulting Services During Bid <br />2 <br />2 <br />4 <br />$ 870.0 <br />Not to Exceed Cost for Task 2 <br />2 <br />2 <br />4 <br />$ 870.0 <br />4 <br />0 <br />0 <br />3.0 Task 3 - Consulting Services during Construction <br />24 <br />3.1 Foundation Upgrade <br />24 <br />12 <br />$ 5,400.00 <br />3.2 Piping Upgrade <br />8 <br />8 <br />$ 2,640.00 <br />3.2 Consultation on Miscellaneous Items <br />8 <br />0 <br />$ 1,800.00 <br />RWC to perform formal responses <br />0 <br />3.3 As -Built Drawings (Consultant to provide original CAD <br />0 <br />0 <br />$ - <br />Drawings and RWC will prepare As-Buik) <br />0 <br />Not to Exceed Cost for Task 3 <br />4 <br />40 <br />44 <br />$ 9,840.00 <br />48 <br />0 <br />$ 10,800.00 <br />0 <br />Task 4.0- Miscellaneous Technical Consulting Services: <br />48 <br />Technical Consulting Services during Construction of California <br />Tank and Pump Station Station Pmject`; and Consulting Structural <br />Engineering Services on miscellaneous water infrastructure <br />capital improvement projects throughout the City <br />Not to Exceed Cost for Task 4 <br />0 <br />48 <br />$ 10,800.00 <br />Not to Exceed Total <br />35 <br />142 <br />$ 39,300.00 <br />`California Tank and Pump Station Station Project has been designed by others. The Consultant is not the Engineer of Record and <br />will provide Consulting Services during construction as needed. <br />Page 11 of 11 <br />REV: 02-11-19 PR <br />ATTY/AGR.2019.035/Donald M Dugan Skyrak Engineering Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.