My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt19 Donald M. Duggan dba Skyrak Engineering Services
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2019
>
Under 60K
>
Agmt19 Donald M. Duggan dba Skyrak Engineering Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2019 9:33:16 AM
Creation date
2/25/2019 9:33:06 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Donald M. Duggan dba Skyrak Engineering Services
PROJECT NAME
Seismic Upgrade of Peninsula Tank No. 2 updae and completition of design seervices and cosultant services during bid
RMP File Number
304.5
Date
2/21/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Consultant shall be available to answer design -related, technical questions from bidders during <br />the bid process. The cost of this task is based on the assumption that the Consultant will <br />not attend any bid meetings, and will not prepare any drawing or specification revisions as a <br />result of questions or comments received during the bid process. <br />Deliverables, Task 2.0: <br />Phone calls and e-mails as necessary. <br />Task 3.0: Seismic Upgrade of Peninsula Tank No. 2 — Consulting Services during <br />Construction <br />The City will have primary responsibility for Design Services during Construction. Consultant <br />shall assist Redwood City in responding to design -related questions, requests for deviations <br />from design, and advice on submittal review. <br />The City will perform the following <br />• Run the pre -construction meeting. <br />• Perform Inspection of Construction. <br />• Respond to Requests for Information, and requests for design clarification. <br />• Respond to Design Change Requests. <br />• Respond to Change Orders. <br />• Record all design changes and prepare as -built drawings. <br />Consultant will be available to respond to technical, design -related questions from the City. <br />If necessary, Consultant will visit the job site to provide assistance to the City's inspectors <br />and to respond to questions in the field. Consultant will not attend the pre- construction <br />meeting. <br />Deliverables, Task 3.0: <br />Phone calls, e-mails and sketches as necessary. <br />Task 4.0: Technical Consulting Services <br />Consultant shall provide Structural and Civil Engineering consulting services to the City to <br />assist the City with its capital upgrade program for water infrastructure. The primary focus will <br />be on the performance of the water system during and after possible earthquakes. <br />The initial focus of this task shall be during the construction phase of the new California <br />Tank and Pump Station Project that has been designed by others. Consulting will be <br />provided as requested by the City; and will also include all other tanks, pump stations, and <br />miscellaneous infrastructure throughout the Redwood City Water System. <br />Deliverables, Task 4.0: <br />Phone calls, e-mails, calculations, technical memos and sketches as requested by the City. <br />3. Schedule <br />Consultant shall complete the tasks as follows: <br />Task 1.0: Task 1.0 will be completed within four calendar weeks of notice to proceed. <br />Task 2.0: As needed during bid. <br />Task 3.0: As needed during construction. <br />Task 4.0: As needed. <br />Page 10 of 11 <br />REV: 02-11-19 PR <br />ATTY/AGR.2019.035/Donald M Dugan Skyrak Engineering Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.