Laserfiche WebLink
Deliverables: <br />• Project cost estimates <br />• Phased CIPS, including maps and descriptions of recommended projects <br />• Meeting agenda, presentation materials, and minutes <br />TASK 10 - PREPARE MASTER PLAN REPORT <br />Subtask 10.1 - Prepare Draft Report <br />The Consultant will incorporate the findings and recommendations of the project into a <br />Sewer System Master Plan report. The report will document study assumptions and <br />methodology, recommended design and performance criteria, model results, approach <br />for capacity enhancement and 1/1 control, and the recommended CIP. The appendices <br />to the report will include the TMs prepared during the course of the study and other <br />pertinent backup data (e.g., model results) that support the plan. The Consultant will <br />prepare a draft master plan report for the City's review. Five (5) copies of the draft report <br />will be submitted. <br />Subtask 10.2 - Meeting with Selected City Staff <br />The Consultant will meet with City staff to receive comments on the Draft report. <br />Subtask 10.3 - Prepare Final Report <br />The Consultant will incorporate City's comments on the draft report into the Final Master <br />Plan Report. Five (5) hard copies of the final report will be submitted. The Consultant <br />will also provide electronic files of report text, mapping and hydraulic models. <br />Deliverables: <br />• Draft reports (5 hard copies) <br />• Final reports (5 hard copies) <br />• Electronic copy of final master plan report, final hydraulic model files delivered in <br />appropriately sized flash drive or external hard drive <br />• Meeting agenda and minutes <br />TASK 11 —OPTIONAL SERVICES <br />The following tasks will be conducted by the Consultant only upon direction from the <br />City. <br />Subtask 11.1— Additional Data Review <br />The Consultant will perform additional review of interim flow monitoring data, survey <br />data or record drawings if needed to supplement the effort budgeted for under previous <br />tasks. <br />Subtask 11.2 - Model Training <br />The Consultant will prepare a <br />The intent of the workshops <br />calibration processes, and to <br />REV: 01-28-19 PR <br />nd conduct up to three training workshops with City staff. <br />will be to guide staff through the model construction and <br />demonstrate how to create scenarios, model new and/or <br />Page 19 of 21 <br />ATTY/AGR.2019.012/Woodard & Curran <br />