My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt06 Fugro West
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2006
>
Agmt06 Under $60K
>
Agmt06 Fugro West
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2008 11:09:26 AM
Creation date
6/8/2006 10:29:05 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Fugro West
PROJECT NAME
environmental services
RMP File Number
304.5
Date
6/2/2006
Box
6586
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />EXHIBIT <br /> <br />A <br /> <br />---.'--'---'.-"._U'. ..,-,.- "'--"'._---.._-._~--"~-'.'CO<'-~"--_._"-~".--'~--'- <br /> <br />- ------.-- ,.-- ---.---..-'. - --. --- -~- ---~ --.-- --- <br />, <br /> <br />i\. <br /> <br /> <br />---.------'.--- <br /> <br />Table 1 <br />Fee Estimate <br />Phase 1 and 2 ESA <br />104 and 112 Cedar Street <br />Redwood City, California <br /> <br />----- <br /> <br />---.- <br /> <br />Task 1 - Phase 1 ESA <br />Associate Engineer 2 hrs@ $160 Ihr $320 <br />Staff Geologist 16 hrs@ $110 fur $1,760 <br />Vehicle 8 hrs@ $12 Ihr $96 <br />Database and Aerial Photography Review Fees 1 fee $450 $450 <br />Subtotal $2.626 <br />Task 2 - Building Material Survey fee $3.000 $3.000 <br />Task 3 - Phase 2 Investigation <br />Utility Survey Contractor 4 hrs@ $120 Ihr $480 <br />Drilling Permit 2 each @ $535 lea $1,070 <br />Drilling Contractor (3 soil probes) 1 day@ $2,400 Iday $2,400 <br />Associate Engineer 4 hrs@ $160 Ihr $640 <br />Staff Geologist 16 hrs@ $110 fur $1,760 <br />Vehicle 8 hrs@ $12 Ihr $96 <br />OVM 1 day@ $75 Iday $75 <br />Miscellaneous Filed Supplies 1 each @ $50 lea $50 <br />Chemical Testing (3 soil & 3 gw samples) <br />TPHg (8015m) 6 each @ $35 lea $210 <br />TPHd. TPHmo with silica gel (8015m) 6 each @ $100 lea $600 <br />17 Metals (601017000) (soil only) 3 each @ $95 lea $285 <br />Lead (6010) (Hand samples only) 4 each @ $20 lea $80 <br />VOCs (8260) (water only) 3 each @ $95 lea $285 <br />Sample disposal fee 10 each @ $5 lea $50 <br />Sample shipment 1 each @ $200 lea $200 <br />Drum Disposal (if needed; assuming Non-Hazardous) 1 each @ $300 lea $300 <br />Subtotal $8,581 <br /> <br />Task 4 - Project Management, Data Evaluation, and Reporting <br />Principal Geologist 2 <br />Associate Engineer 14 <br />Staff Geologist 28 <br />Drafting 6 <br />Clerical 4 <br />Subtotal <br /> <br />G:'propo«d. WTk'¡)f>-O66 - COSI- EstimDt<.XLS <br /> <br />hrs@ $180 fur $360 <br />hrs@ $160 Ihr $2.240 <br />hrs @ $110 Ihr $3,080 <br />hrs@ $90 Ihr $540 <br />hrs@ $70 fur $280 <br /> $6.500 <br /> TOTAL $20,707 <br />Preliminary additional testing 1.293 <br />GRAND TOTAL $22,000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.