My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt06 Lorraine Weiss Design &
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2006
>
Agmt06 Under $60K
>
Agmt06 Lorraine Weiss Design &
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2008 11:58:49 AM
Creation date
6/12/2006 12:20:59 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Lorraine Weiss Design & Development Review
PROJECT NAME
contract planning services
RMP File Number
304.5
Date
6/12/2006
Box
6586
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Scope o/Work: Seaport Self Storage - Redwood City <br />Page 2 <br /> <br />10. <br /> <br />Preparation of an Initial Study and associated Negative Declaration. <br /> <br />Preparation of staff reports to the City's Architectural Review Committee, <br />Planning Commission, and City Council. <br /> <br />Attendance at meetings of the City's Architectural Review Committee, Zoning <br />Administrator, Planning Commission, and City Council, as required (two (2) <br />meetings with the ARC, one (1) meeting with the Zoning Administrator, and one <br />(1) meetings with the Commission. <br /> <br />8. <br />9. <br /> <br />This proposal is intended to anticipate work over a three to nine month period, at the <br />discretion of the City of Redwood City. Work would primarily occur off-site, but I will <br />be readily available to meet at City Hall or elsewhere as needed during the course of the <br />project. Should the project require any specialty subconsultant(s) (i.e. biological <br />resources, soils engineer, etc.) for the preparation of the Initial Study, the budget would <br />increase based on the fee associated with the subconsultant(s) work and my time related <br />to the review of the subconsultant(s) work products and insertion of explanation into the <br />Initial Study on a time and materials basis. <br /> <br />Billing and Project Cost <br /> <br />Work will be billed at the rate of $120.00 per hour, billed in quarter-hour increments. <br />All hours worked will be accounted for in detail and invoiced to the City on a monthly <br />basis. Any and all unusual expenses incurred in the perfonnance of this work, including <br />but not limited to printing and copying, photo processing, etc., will be invoiced to the <br />City at no additional mark-up. Mileage or travel expenses are anticipated based on the <br />number of site visits and attendance of public meetings. <br /> <br />Project costs are estimated at $18,960.00, projected as outlined in the attached Table 1, <br />and shall not exceed that figure without the express written pennission of the City, after <br />consultation with the project applicant. The project estimate is not, however, intended to <br />be a "not-to-exceed" figure, as project and process complexities cannot be predicted with <br />certainty and it is unknown at this time whether subconsultants would be hired for <br />specialized analysis as indicated above. <br /> <br />Please contact me if you have any questions or require additional infonnation. <br /> <br />Sincerely, <br /> <br />~U~ <br /> <br />Lorraine Weiss, Principal <br />LORRAINE WEISS DESIGN & DEVELOPMENT REVIEW <br /> <br />attachment <br />
The URL can be used to link to this page
Your browser does not support the video tag.