6.F. - Page 17 of 32
<br />ANALYSIS
<br />This priority one project will construct anew 750,000 gallon water tank including associated pipelines and
<br />pump station facilities within the next two years. The project components are:
<br />• Construction of a potable water tank on a city owned site at 841 California Way, at the
<br />intersection with Tum Suden Way;
<br />• Construction of a soil nailed retaining wall approximately 160 linear foot long and from 7
<br />to 20 feet high, located on the hillside west side of the new tank;
<br />• Replacement of existing pipeline to connect the new water tank to the Easter Cross water
<br />tank, located up-slope of the project site;
<br />• Construction of new on-site pipeline between the new water tank and the new pump
<br />station on the project site;
<br />• Construction of a new 2,000 foot long transmission pipeline from the new tank to an
<br />existing pipeline at Jefferson Avenue and Fallen Leaf Way, to serve as pumping line from
<br />Lakeview Water Station to the newtank;
<br />• Replacement of the existing California Pump Station; and
<br />• Installation of anew emergency power generator to service the new pump station
<br />The Engineer's Probable Cost Estimate of this project is approximately $9,030,000.00.
<br />Staff conducted a non -mandatory pre-bid meeting on November 27, 2018 and the Bid Opening was held
<br />on December 19, 2018.
<br />The City received five bids as listed below:
<br />Bidder
<br />Total Bid Amount
<br />Total Bid Amount
<br />lowest to highest at bid time)
<br />(as bid)
<br />(after corrections)
<br />MB Construction, Inc. From San Francisco, CA
<br />10,814,761.00
<br />$11,259,761.00
<br />Disney Construction, Inc. From Burlingame, CA
<br />10,862,000.00
<br />10,022,000.00
<br />Anderson Pacific Engineering Construction, Inc.
<br />11,277,860.00
<br />$11,277,860.00
<br />From Santa Clara, CA
<br />Mountain Cascade, Inc. From Livermore, CA
<br />11,555,145.00
<br />11,555,145.00
<br />Anvil Bidders, Inc. From San Francisco, CA
<br />12,243,505.00
<br />12,243,505.00
<br />Upon receipt of the bids, bidders were allowed to submit any bid protests as provided in the Project
<br />Specifications, Section 00200 - Instructions to Bidders, Paragraph 1.15. No bid protest was submitted on
<br />nor before the fifth business day after the bid opening, as allowed.
<br />Staff evaluated the five bids. The evaluation was conducted based In the Project Documents Section 00200
<br />- Instruction to Bidders. Paragraph 1.14 of this Section contains provisions that allow the City to reject any
<br />City of Redwood City 1017 Middlefield Road, Redwood City, CA, 44063 Tel: 650-780-7000 www.redwoodcitv.or¢
<br />124