Laserfiche WebLink
6.B. -Page 16 of 17 <br />Task 3 Meetin_ps <br />• Architectural Advisory <br />Committei Meeting <br />• Community Workshop <br />• Public Hearings (2) <br />Schedule <br />Task3Prodi <br />• Outreach Materials <br />• Final Design Guidelines and <br />Findings <br />The schedule for the Single -Family Residential Design Guidelines project is <br />presented below. Milestones and key products and meetings are shown. The <br />overall proposed project schedule balances time requirements for thorough <br />analysis and public input opportunities with City needs for timely project <br />completion over 12 months.. <br />Month 1 2 <br />3 <br />4 5 <br />1. <br />Kick-off Information <br />Community <br />Architectural <br />Task l: Meeting Gathering <br />Tour <br />Reference <br />Survey <br />Workshop Advisory workshop <br />#20ph <br />Establishing and Meetings <br />(Ommi <br />1 <br />hS <br />#l: Issues 1PCM eting <br />. <br />Prefferencerens <br />es & <br />Benchmarking Outreach Residential <br />Architectural Permit Findings and Next Steps <br />Program Design Study <br />Findings <br />Memo Recommendations Memo <br />Task 2: Draft <br />Concept and <br />Permit <br />Permit Findings Outline Illustrations <br />Design Guidelines <br />& Architectural <br />Permit Findings <br />Draft Guidelines and Summary <br />Findings Review Memo <br />Task 3: Review <br />& Adoption <br />IConsultant Effort <br />Meeting n 'Workshop ♦ Deliverable Y Public Hearing <br />Page 13 of 14 <br />REV: 03-28-19 PR <br />ATTY/AGR.2019.071/Lisa Wise Consulting, Inc. <br />Architectural Advisory Workshop #3: Design <br />Committee/PC Meeting Guidelines and Findings <br />Final Design Guidelines <br />and Findings <br />45 <br />