My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2019-04-08 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2019
>
AgdaPkt 2019-04-08 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2020 10:54:06 AM
Creation date
4/4/2019 4:43:39 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
4/8/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
390
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.D. - Page 16 of 27 <br />Task 2 Deliverables. <br />• Existing Conditions Memo <br />• Traffic count data <br />• Yield study findings for Jefferson and Clinton intersection <br />TASK 3: DEVELOPMENT OF DESIGN ALTERNATIVES <br />Consultant shall prepare conceptual design alternatives that reflect the <br />Complete Streets best practices to increase safety for pedestrian, bicycle, and <br />vehicular movements at the project intersection. <br />Task3.1:Preliminary Engineering and Alternative Development <br />Consultant shall develop up to three (3) conceptual design alternatives for the <br />Jefferson/Cleveland intersection. The alternatives shall address the project <br />goals and priorities and shall focus on increasing the safety and multimodal <br />function at the Jefferson/Cleveland intersection including reducing vehicle <br />speeds, incorporating bike facilities, and improving intersection crossings and <br />geometry. Crosswalk and intersection art, or other types of public artwork, <br />may be of interest to community members and will be considered as an option <br />for the project. Consultant shall prepare order -of -magnitude construction cost <br />estimates for the alternatives. <br />Alternative designs may include: <br />• Pedestrian Hybrid Beacon (PHB) or full traffic signal <br />• Pedestrian crossing enhancements such as high- visibility crosswalks and <br />rectangular rapid flashing beacons (RRFBs) <br />• A diverter and partial road closure to limit vehicle movements to right -out only <br />onto Jefferson Avenue; bicyclists will be allowed to continue straight and will be <br />able to actuate the traffic control to facilitate crossing Jefferson <br />• Bulb -outs at the northwest and southwest corners with ADA -compliant curb <br />ramps and shorted crossing distances. <br />The design alternatives will be reviewed by City staff before presenting at the <br />community workshop. City staff will schedule an in-person meeting with Consultant to <br />discuss the designs and revisions if there is a need. <br />Page 13 of 23 <br />REV: 03-28-19 PR <br />ATTYIAGR.2019.0741AIta Planning + Design, Inc. <br />73 <br />
The URL can be used to link to this page
Your browser does not support the video tag.