My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2019-04-08 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2019
>
AgdaPkt 2019-04-08 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2020 10:54:06 AM
Creation date
4/4/2019 4:43:39 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
4/8/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
390
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.D. - Page 24 of 27 <br />• Prepare addenda to bid documents, if required <br />• Provide agenda and meeting minutes to pre-bid and pre -construction meetings <br />• Responses to Requests for Information <br />• Shop and material submission approvals <br />• As -built drawings <br />• Quality assurance and inspection <br />• "Punch list" items (upon request) <br />TASK 10: ADDITIONAL WORK (CONTINGENCY) <br />Consultant shall provide additional support and services that arise during the project, <br />for an amount not to exceed 10% of the agreement budget. The 10% contingency is <br />included in the project budget as a separate line item. Consultant shall receive <br />written approval from the City prior to initiating any "contingency" work. <br />OPTIONAL TASK - DESIGN OF INTERSECTION IMPROVEMENTS AT JEFFERSON AND CLINTON <br />The City may elect to authorize this additional task for the Consultant to prepare design <br />alternatives, community outreach material, and design documents for intersection <br />improvements identified as part of Task 3.28. The specific scope shall be determined <br />prior to the authorization of this flask. <br />It is assumed the design process for the Jefferson and Clinton improvements would <br />proceed in parallel with the associated tasks in this contract. A lump sum cost was <br />provided in the cost estimate that assumes the design of a pedestrian hybrid beacon. <br />Actual design cost may vary once the scope is determined. <br />No work on this task shall be authorized unless and until the agreement is amended by <br />agreement of both parties. <br />I. EXCLUSIONS <br />The scope of this contract is intended to cover the work identified above. It does not <br />include any of the following: <br />• Environmental documents (CEQA or NEPA) or permits <br />• Geotechnical analysis or recommendation <br />• Utility potholing <br />• ROW acquisition or any tasks related to acquisition (i.e., plat preparation, etc.) <br />• Any other services not explicitly stated above <br />Page 21 of 23 <br />REV: 03-28-19 PR <br />ATTYIAGR.2019.0741Alta Planning + Design, Inc. <br />81 <br />
The URL can be used to link to this page
Your browser does not support the video tag.