My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2019-04-08 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2019
>
AgdaPkt 2019-04-08 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2020 10:54:06 AM
Creation date
4/4/2019 4:43:39 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
4/8/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
390
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.D. - Page 23 of 27 <br />Task 7 Deliverables: <br />• 90% PS&E - Two (2) hardcopy sets of 24" X 36" plan documents, along with 8.5" <br />X 11" specifications and estimates. Electronic versions will be provided as well. <br />Electronic drawings with be compatible with AutoCAD 2015. <br />• 65% plan redlines with City's comments <br />• Comment matrix in Word format <br />TASK 8:100% PLANS, SPECIFICATIONS, AND ESTIMATES <br />Consultant shall meet with City Engineering Division staff to review and begin to <br />incorporate comments received on the 90% PS&E submittal and refine the documents <br />for the 100% PS&E submittal. Comments and responses shall be compiled into a matrix <br />to document the process and original redlines shall be returned to the City. Consultant <br />shall prepare a final (100%) bid set including the final technical specifications and <br />opinion of probable of construction costs, along with final plans that include all the <br />sheets previously described. Consultant shall also include a line item bid schedule <br />formatted to include in the bid package (to be filled in by each bidder). <br />Task 8 Deliverables: <br />• 100% PS&E -Four (4) hardcopy sets of 24"X 36" plan documents, along with <br />8.5" X 11" specifications and estimates. Electronic versions will be provided as <br />well. Electronic drawings with be compatible with AutoCAD 2015. <br />• 90% plan redlines with City's comments <br />• Comment matrix in Word format <br />TASK 9: CONSTRUCTION ENGINEERING/ SUPPORT <br />Consultant project manager shall remain available during the project bidding phase <br />to answer contractor questions and provide support as required by the City. Up to 72 <br />hours of Consultant staff time is allocated to construction engineering support. <br />Consultant support shall continue during project construction, through periodic <br />attendance at up to five construction meetings, reviews, and responses to Requests <br />for Information (RFIs), reviews and approval of materials and shop drawing <br />submissions, and preparation of as -built drawings. Consultant may also assist the <br />City's construction manager in the preparation of a close-out "punch list" if requested. <br />Task 9 Deliverables: <br />• Attend pre -construction, pre-bid, and construction meetings as needed <br />• Respond to bidder's questions <br />Page 20 of 23 <br />REV: 03-28-19 PR <br />ATTY/AGR.2019.0741Alta Planning + Design, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.