My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt97 Flatirons Funding (2)
RedwoodCity
>
City Clerk
>
Agreements
>
1990-1999
>
1997
>
Agmt97 Flatirons Funding (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2006 10:26:16 AM
Creation date
7/12/2006 10:01:47 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Flatirons Funding
PROJECT NAME
improvement of Electronic Arts subdivision
RMP File Number
100 - bin 2A
Date
3/18/1997
Reso Ref
12993 13385
MO Ref
99-039
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />8. <br /> <br />GUARANTEE OF WORKMANSHIP AND MATERIALS. If, within a <br /> <br />period of one year after acceptance by City of any Improvement or any Related <br /> <br />Work, the Improvement or the Related Work or the Labor and Materials required <br /> <br />by that Improvement or Related Work fail to fulfill the requirements of this <br /> <br />Agreement, including without limitation, the requirements of the Plans and <br /> <br />Specifications, Owner shall, upon receipt of a request in writing from City, without <br /> <br />delay and at no cost to City, repair, replace or reconstruct any defective or otherwise <br /> <br />unsatisfactory part or parts of the Improvement or the Related Work or the Labor <br /> <br />and Materials required by that Improvement or Related Work. If Owner does not <br /> <br />promptly make that repair, replacement or reconstruction, or otherwise act in <br /> <br />accordance with this requirement to repair, replace or reconstruct, the City may, at <br /> <br />its option, make the necessary repair, replacement or reconstruction or perform the <br /> <br />necessary work, and Owner shall pay to City the actual cost thereof plus fifteen <br /> <br />percent (15%). If City in the exercise of its reasonable discretion determines that the <br /> <br />necessary repair, replacement or reconstruction must be made before Owner can be <br /> <br />notified, City may also make that repair, replacement or reconstruction or perform <br /> <br />the necessary work, and Owner shall pay to City the actual cost thereof plus fifteen <br /> <br />percent (15%). Notwithstanding any provision to the contrary in this Agreement, <br /> <br />Owner is not responsible for repair, replacement or reconstruction of any <br /> <br />Improvements or Related Work, accepted by City and necessitated by Acts of God, <br /> <br />acts of third parties (other than Owner, its agents, employees or contractors) beyond <br /> <br />Owner's ability to control, civil emergencies, natural disasters or similar acts or <br /> <br />events. <br /> <br />-6- <br />
The URL can be used to link to this page
Your browser does not support the video tag.