<br />EXHIBIT A <br />Scope of Services and Fees <br /> <br />JJR Construction, Inc. <br />FY 2008-2009 Unit Bid Prices <br />Amendment no. 2 <br />TO THE 2005-2006 COST SHARED SIDEWALK REPAIR PROJECT <br /> <br />BID 2007 -2008 2008 CPI 2008-2009 <br />ITEM UNIT BID % UNIT BID <br />NO. DESCRIPTION PRICES INCREASE PRICES <br />1 Remove existinQ sidewalk $ 5.17 2.8% $ 5.31 <br />2 Construct concrete sidewalk $ 8.26 2.8% $ 8.49 <br />2a Rubber sidewalk installation* $ 20.66 N/A $ 5.00 <br />3 Remove existinQ drivewav $ 6.20 2.8% $ 6.37 <br />4 Construct concrete driveway $ 8.26 2.8% $ 8.49 <br />5 Remove existing curb and Qutter $ 15.50 2.8% $ 15.93 <br />6 Construct concrete curb and gutter $ 30.99 2.8% $ 31.86 <br />7 Remove walkwav material $ 8.26 2.8% $ 8.49 <br />8 Construct wheelchair ramp (c&a pd under Bid item #6) $ 20.66 2.8% $ 21.24 <br />9 Remove and replace AC paving $ 12.40 2.8% $ 12.75 <br />10 Install irrigation system $ 10.33 2.8% $ 10.62 <br />11 Install tree grates $ 723.10 2.8% $ 743.35 <br />12 Additional subbase excavation $ 41.32 2.8% $ 42.48 <br />13 Drain line installation $ 103.30 2.8% $ 106.19 <br /> <br />* Contractor will only prepare the site, not install rubber panels. <br />