My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2002-10-07
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2002
>
AgdaPkt 2002-10-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2005 2:54:07 PM
Creation date
10/3/2002 2:07:34 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Agency Type
City Council
Date
10/7/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I~oRT£CH CONSUL TIN~ INC. P~g~ 2 <br /> <br /> directions and priorities established by Redwood City's Information <br /> Technology Division. <br /> <br /> 3. Automated interface with other IT systems for production reliability. <br /> <br /> 4. Ability of water customers to view their historical water consumption data and <br /> target allocation information through the Redwood City website over the <br /> Internet. <br /> <br /> 5. Elimination of extraneous programs and operations, thereby simplifying the <br /> entire process of managing water allocation information. <br /> <br /> 6. Framework for implementing future functional enhancements including an <br /> administrator's interface for tuning water allocation parameters, a versatile <br /> automatic chart generator for producing graphical web-based reports, and a <br /> mechanism to support water surveys for commemial customers. <br /> <br />Much of the design of WAP2 has already been done as part of the amhitectural <br />assessment that was completed in August. That work was completed under budget, <br />and the remaining design work for WAP2 can be finished under that contract. <br /> <br />The remainder of the work for WAP2 involves the implementation, test, installation, <br />and documentation of the system. <br /> <br />Costs <br /> <br />The cost of this work is $27,500, broken down as follows: <br /> <br /> · Project management $ 1,800 <br /> · Implementation 10,800 <br /> · Test 7,200 <br /> · Documentation 6,000 <br /> · Acceptance/Refinement 1,200 <br /> · Materials~ 500 <br /> · TOTAL ~27.500 <br /> <br />Schedule <br /> <br />Bill is available to begin this project immediately, and if so authorized, we believe <br />the project can be completed by November 30. <br /> <br /> SQl. Sct~'cr 2000 Developer l~difion <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.