My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt19 Fehr & Peers
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2019
>
Agmt19 Fehr & Peers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2019 11:39:07 AM
Creation date
4/16/2019 11:35:48 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Fehr & Peers
PROJECT NAME
Transportation planning and engineering Roosevelt Ave.
RMP File Number
304
Date
4/11/2019
MO Ref
19-068
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Task 7.2 10-15% Design Concepts <br />Consultant shall prepare a 10-15% corridor -wide concept plan for the preferred alternative by <br />building off the base map created in Task 2.1, and the initial set up in Task 5. Consultant shall <br />confirm construction feasibility and document the key factors affecting constructability, <br />including ROW constraints, location of utilities and infrastructure components. <br />The 10-15% concept plans shall include proposed curb alignments, basic lane striping, outlines <br />of planting areas and special hardscape treatments, and other information. It is assumed that <br />the conceptual drawings represent only concepts to solicit feedback from the community on <br />their preferred improvement alternative and for potential grant applications for future phases of <br />this project. The conceptual drawings are not to be used for construction as they are not <br />sufficient in detail or specificity to be used for that purpose. Future engineering analysis and <br />design, not included in this scope of services, will be required in order to prepare a final design <br />for construction and for construction engineering estimates. Revisions and modifications to the <br />conceptual design will be needed during the development of PS&E documents (Plans, <br />Specifications, and Estimates) which is outside of the scope of work for this Agreement. <br />Deliverables: <br />Draft CAD drawings and design basis for 10-15% design concepts <br />Task 7.3 Final Traffic Calming Plan <br />City will deliver one set of internally -consistent and consolidated comments to Consultant. <br />Consultant shall review all comments and revise the draft report and CAD drawings to produce <br />the final Traffic Calming Plan. <br />Deliverables: <br />Final plan report and appendices <br />Final CAD drawings and design basis for 10-15% design concepts <br />Page 18 of 20 <br />REV: 03.28-19 PR <br />ATTY/AGR.2019.075/Fehr and Peers <br />
The URL can be used to link to this page
Your browser does not support the video tag.