My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt19 Fehr & Peers
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2019
>
Agmt19 Fehr & Peers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2019 11:39:07 AM
Creation date
4/16/2019 11:35:48 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Fehr & Peers
PROJECT NAME
Transportation planning and engineering Roosevelt Ave.
RMP File Number
304
Date
4/11/2019
MO Ref
19-068
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
design plans by setting up the more detailed planview drawings for the mid -block segments of <br />the preferred alternative. <br />Deliverables: <br />Refined preferred improvement alternatives <br />Refined cross-sections <br />Refined 3D design of site improvements <br />Task 6. Development of Conceptual Cost Estimates <br />Development of thorough conceptual cost estimates is important to assist the city in securing <br />funding through grant applications and ultimately implementing projects. Consultant shall <br />prepare conceptual cost estimates for the Preferred Alternative with enough detail for future <br />grant applications. This shall include estimates for all infrastructure components (e.g. <br />intersections, bus stops, and signals) as well as any potential easements or utility relocations. <br />Consultant shall develop a project implementation plan for the preferred alternative, to include <br />recommendations for the phasing, prioritization, and funding of discrete projects, which will <br />cumulatively represent the overall preferred alternative. Funding sources relevant to specific <br />projects shall be identified, potentially including opportunities to integrate improvements into <br />construction related to private developments. <br />Deliverables: <br />Conceptual cost estimates for the preferred alternative <br />Phasing plan for implementation <br />Task 7. Development of Draft and Final Plan Report & 10-15% Design <br />Task 7.1 Draft Traffic Calming Plan <br />Consultant shall develop a draft Traffic Calming Plan, which shall incorporate the Task 2-6 <br />deliverables into a cohesive narrative that explains the community design process. This shall <br />include the final versions of applicable graphics from previous tasks for a visually -appealing <br />narrative. Technical data shall be included in the appendix. <br />Deliverables: <br />Draft Traffic Calming Plan and appendices <br />Page 17 of 20 <br />REV: 03-28-19 PR <br />ATTY/AGR.2019.075/Fehr and Peers <br />
The URL can be used to link to this page
Your browser does not support the video tag.