Laserfiche WebLink
Task 4.2: Community Workshop <br />Consultant shall work with the City to plan and host one engaging, collaborative, and <br />interactive community workshop. The workshop will cover: project introduction, <br />preliminary goals, existing conditions and constraints, outreach process, and the <br />design alternatives developed in Task 3. <br />Consultant shall develop outreach materials for the workshop, including graphics and <br />drawings, roll plots, PowerPoint slides, and examples design alternatives. Consultant <br />shall prepare bilingual meeting flyers for the City to distribute. <br />Consultant shall document, collect, and summarize community comments and the <br />feedback generated at the community workshop. <br />Task4.3:Complete Streets Advisory Committee (CSAC) Presentation <br />Based on the input received from the community workshop, Consultant shall prepare <br />presentation material for the CSAC which may include graphics, design alternatives, <br />and a summary of the outreach process. Consultant and the City will coordinate on <br />the presentation to help explain the process of the project and the alternatives. <br />Task 4 Deliverables: <br />• Bilingual meeting flyer <br />• Meeting facilitation, presentation, and meeting materials for community workshop <br />• Meeting summary and documentation (sign -in sheet(s)) <br />• CSAC presentation material <br />TASK 5:15% DESIGN CONCEPT AND PLANNING REPORT <br />Task 5.1:15% Concept Design <br />Based on the input received from both the CSAC and community meeting, Consultant <br />shall advance and update one alternative: the preferred altemative. The concept <br />layouts and cross-sections for the preferred alternative shall be developed into a 15% <br />design. <br />Task 5.2: Summary Report <br />Based on the findings of the 15% design, Consultant shall prepare a Preferred Project <br />Alternative Summary Report consisting of the following design elements: <br />• Alternative description <br />• Evaluation of alternative benefits and attributes based on the Project Goals and <br />Priorities Memo <br />Page 15 of 23 <br />REV: 03-28-19 PR <br />ATTY/AGR.2019.074/Alta Planning + Design, Inc. <br />