My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt19 Alta Planning + Design, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2019
>
Agmt19 Alta Planning + Design, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2019 3:08:06 PM
Creation date
4/16/2019 11:36:13 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Alta Planning + Dsign
PROJECT NAME
Jefferson Ave and Clevland St. safety improvements (PS&E)
RMP File Number
304
Date
4/11/2019
MO Ref
19-067
Document Relationships
MO 19-067
(Message)
Path:
\City Clerk\Minute Orders\2010-2019\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Task 4.2: Community Workshop <br />Consultant shall work with the City to plan and host one engaging, collaborative, and <br />interactive community workshop. The workshop will cover: project introduction, <br />preliminary goals, existing conditions and constraints, outreach process, and the <br />design alternatives developed in Task 3. <br />Consultant shall develop outreach materials for the workshop, including graphics and <br />drawings, roll plots, PowerPoint slides, and examples design alternatives. Consultant <br />shall prepare bilingual meeting flyers for the City to distribute. <br />Consultant shall document, collect, and summarize community comments and the <br />feedback generated at the community workshop. <br />Task4.3:Complete Streets Advisory Committee (CSAC) Presentation <br />Based on the input received from the community workshop, Consultant shall prepare <br />presentation material for the CSAC which may include graphics, design alternatives, <br />and a summary of the outreach process. Consultant and the City will coordinate on <br />the presentation to help explain the process of the project and the alternatives. <br />Task 4 Deliverables: <br />• Bilingual meeting flyer <br />• Meeting facilitation, presentation, and meeting materials for community workshop <br />• Meeting summary and documentation (sign -in sheet(s)) <br />• CSAC presentation material <br />TASK 5:15% DESIGN CONCEPT AND PLANNING REPORT <br />Task 5.1:15% Concept Design <br />Based on the input received from both the CSAC and community meeting, Consultant <br />shall advance and update one alternative: the preferred altemative. The concept <br />layouts and cross-sections for the preferred alternative shall be developed into a 15% <br />design. <br />Task 5.2: Summary Report <br />Based on the findings of the 15% design, Consultant shall prepare a Preferred Project <br />Alternative Summary Report consisting of the following design elements: <br />• Alternative description <br />• Evaluation of alternative benefits and attributes based on the Project Goals and <br />Priorities Memo <br />Page 15 of 23 <br />REV: 03-28-19 PR <br />ATTY/AGR.2019.074/Alta Planning + Design, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.