My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt19 Alta Planning + Design, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2019
>
Agmt19 Alta Planning + Design, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2019 3:08:06 PM
Creation date
4/16/2019 11:36:13 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Alta Planning + Dsign
PROJECT NAME
Jefferson Ave and Clevland St. safety improvements (PS&E)
RMP File Number
304
Date
4/11/2019
MO Ref
19-067
Document Relationships
MO 19-067
(Message)
Path:
\City Clerk\Minute Orders\2010-2019\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Task 3.2: Traffic Analysis and Summary <br />Consultant shall conduct traffic analysis to summarize the potential impact of each <br />design alternative. Consultant shall provide a qualitative and quantitative traffic analysis <br />of the design alternatives that may include: <br />• Traffic signal warrants per Part 4 of the California Manual for Uniform Traffic <br />Control Devices (CAMUTCD) <br />• Level of Service analysis and comparison between the signalized and non - <br />signalized alternatives <br />• Level of Service analysis for proposed changes to existing geometry, lane <br />configuration, or operations <br />Task 3.213: Intersection and Traffic Analysis at Jefferson and Clinton <br />Consultant shall review the collected traffic and vehicle to pedestrian yield data at the <br />Jefferson/Clinton intersection to determine if additional crossing treatments are <br />warranted. Alta shall utilize the FHWA, Guide for improving Pedestrian Safety at <br />Uncontrolled Crossing Locations, to make recommendations. Recommendations made <br />may be further developed into conceptual design altematives and a PS&E package as <br />part of an optional task. <br />Task 3 Deliverables: <br />• Up to three (3) conceptual design alternatives <br />• Order -of -magnitude construction cost estimates for the alternatives <br />• Traffic analysis for the alternatives <br />• Summary matrix comparing the alternatives <br />Note: The Jefferson/Clinton improvement design is listed under a separate, optional <br />task. No work shall be initiated for the Jefferson/Clinton intersection unless and until an <br />amendment to this Agreement is executed. <br />TASK 4: COMMUNITY OUTREACH <br />Task 4.1: Project Website <br />City staff will create and maintain the project webpage. The webpage will provide for <br />the dissemination of information to community members and stakeholders and may <br />contain project schedule and status, memorandums, design concepts, and public <br />meeting materials. <br />Page 14 of 23 <br />REV: 03-28-19 PR <br />ATTY/AGR.2019.074/Alta Planning + Design, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.