Laserfiche WebLink
Task 2 Deliverables: <br />• Existing Conditions Memo <br />e Traffic count data <br />• Yield study findings for Jefferson and Clinton intersection <br />TASK 3: DEVELOPMENT OF DESIGN ALTERNATIVES <br />Consultant shall prepare conceptual design alternatives that reflect the <br />Complete Streets best practices to increase safety for pedestrian, bicycle, and <br />vehicular movements at the project intersection. <br />Task3.1:Preliminary Engineering and Alternative Development <br />Consultant shall develop up to three (3) conceptual design alternatives for the <br />Jefferson/Cleveland intersection. The alternatives shall address the project <br />goals and priorities and shall focus on increasing the safety and multimodal <br />function at the Jefferson/Cleveland intersection including reducing vehicle <br />speeds, incorporating bike facilities, and improving intersection crossings and <br />geometry. Crosswalk and intersection art, or other types of public artwork, <br />may be of interest to community members and will be considered as an option <br />for the project. Consultant shall prepare order -of -magnitude construction cost <br />estimates for the alternatives. <br />Alternative designs may include: <br />• Pedestrian Hybrid Beacon (PHB) or full traffic signal <br />• Pedestrian crossing enhancements such as high- visibility crosswalks and <br />rectangular rapid flashing beacons (RRFBs) <br />• A diverter and partial road closure to limit vehicle movements to right -out only <br />onto Jefferson Avenue; bicyclists will be allowed to continue straight and will be <br />able to actuate the traffic control to facilitate crossing Jefferson <br />• Bulb -outs at the northwest and southwest corners with ADA -compliant curb <br />ramps and shorted crossing distances. <br />The design alternatives will be reviewed by City staff before presenting at the <br />community workshop. City staff will schedule an in-person meeting with Consultant to <br />discuss the designs and revisions if there is a need. <br />Page 13 of 23 <br />REV: 03-28-19 PR <br />ATTY/AGR.2019.074/Alta Planning + Design, Inc. <br />