My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt19 Alta Planning + Design, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2019
>
Agmt19 Alta Planning + Design, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2019 3:08:06 PM
Creation date
4/16/2019 11:36:13 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Alta Planning + Dsign
PROJECT NAME
Jefferson Ave and Clevland St. safety improvements (PS&E)
RMP File Number
304
Date
4/11/2019
MO Ref
19-067
Document Relationships
MO 19-067
(Message)
Path:
\City Clerk\Minute Orders\2010-2019\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Existing topographic data <br />Task 2.2: Site Visit and Walk <br />Consultant shall conduct a site visit during school peak and off-peak hours. This site <br />walk will allow the project team to note the existing field conditions and to make <br />observations. City staff will also attend the site visit. <br />Task 2.3: Data Collection <br />After reviewing the available data and site visit, Consultant shall determine what <br />additional data might be needed and a schedule for its collection with the City's Project <br />Manager. Consultant shall collect traffic data including traffic turning movements, <br />vehicular and bicycle and pedestrian counts as follow: <br />• For Jefferson and Cleveland intersection: <br />12 -hour count with peak morning and peak afternoon counts <br />• For Jefferson and Clinton: <br />14 -hour count with peak morning and peak afternoon counts as well as video <br />recording to be used for the yield study <br />Consultant shall collect the new counts prior to the community meeting and before the <br />end of the school year. <br />Other information to be evaluated are the estimated and existing bicycle and pedestrian <br />demand, desired lane and curb lane use, available public right of way, and stormwater <br />management requirements. <br />City staff will provide the utility data for city utilities (water, sewer, and storm water). <br />Consultant shall obtain other utility data such as power and communication data from <br />the providers. <br />Task 2.4: Existing Conditions Summary <br />Consultant shall use the exiting and collected data to develop an Existing Conditions <br />Summary Memo that will detail the baseline conditions, project needs, constraints and <br />assumptions and will identify the opportunities, risks and risk mitigation approach. The <br />Existing Condition Summary shall include the Jefferson/Cleveland and Jefferson/Clinton <br />intersections and their immediate environs. <br />Information shall be presented in a clear manner and further illustrated through tables, <br />maps and graphics in such a way that is accessible to the general public. This <br />information and memo will be presented at the project community meeting. <br />Page 12 of 23 <br />REV: 03-28-19 PR <br />ATTY/AGR.2019.074/Alta Planning + Design, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.