Laserfiche WebLink
Task 4: 90% PLANS, SPECIFICATIONS, AND ESTIMATES <br />Consultant shall meet with the City to review and begin to incorporate comments received on the <br />65% PS&E submittal, along with any other data collected, and refine the documents for the 90% <br />PS&E submittal. Comments and responses shall be compiled into a matrix to document the <br />process and original redlines shall be returned to the City. Draft technical specifications shall be <br />prepared in accordance with the outline specifications prepared for the 65% PS&E. Requirements <br />for all material submittals shall be included in the draft specifications. Similarly, the opinion of <br />probable construction costs shall be updated and submitted. The 90% design shall consist: <br />signing and striping drawings, street lighting and signal design, civil design and grading, <br />construction notes, construction cost estimates and construction schedule. <br />Consultant shall transmit the 90% PS&E to the City for review and attend a meeting to review the <br />documents. Consultant may move forward with the 100% PS&E preparation in parallel with the <br />City's review of the 65% PS&E in order to keep the project delivery on the schedule. <br />Task.4 Deliverables: <br />• 90% PS&E - Two (2) hardcopy sets of 24" X 36" plan documents, along with 8.5" X 11" <br />specifications and estimates. Electronic versions will be provided as well. Electronic <br />drawings with be compatible with AutoCAD 2015. <br />• 65% plan redlines with City's comments <br />• Comment matrix in Word format <br />Task 5: 100% PLANS, SPECIFICATIONS, AND ESTIMATES <br />Consultant shall meet with the City to review and begin to incorporate comments received on the <br />90% PS&E submittal and refine the documents for the 100% PS&E submittal. Comments and <br />responses shall be compiled into a matrix to document the process and original redlines shall be <br />returned to the City. Consultant shall prepare a final (100%) bid set including the final technical <br />specifications and opinion of probable of construction costs, along with final plans that include all <br />the sheets previously described. Consultant shall also include a line item bid schedule formatted <br />to include in the bid package (to be filled in by each bidder). <br />Task.5 Deliverables: <br />• 100% PS&E - Four (4) hardcopy sets of 24" X 36" plan documents, along with 8.5" X <br />11" specifications and estimates. Electronic versions will be provided as well. Electronic <br />drawings with be compatible with AutoCAD 2015. <br />• 90% plan redlines with City's comments <br />• Comment matrix in Word format <br />REV: 11-01-19 PR <br />ATTY/AGR.Amend No. 1/Alta Planning + Design (Page 6 of 7) <br />