My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt19 Bay Area Paving
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2019
>
Agmt19 Bay Area Paving
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2022 3:32:22 PM
Creation date
4/19/2019 2:04:37 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Bay Area Paving, Inc.
PROJECT NAME
ADA Sidelwalk ramps
RMP File Number
304
Date
3/18/2019
MO Ref
19-042
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV: 02-18-2022 RL <br />relocated for ADA ramp installation, additional excavation may be required. <br />Where root pruning is required, the sidewalk shall be removed and excavation <br />shall not occur until after root cutting is performed. Contractor is responsible for <br />the repair of existing irrigation systems. <br />vi. Measurements: Sidewalks shall be measured and paid to the nearest square foot <br />exclusive of the curb and gutter. Curb and gutter shall be measured and paid to <br />the nearest linear foot. ADA ramps shall be paid per unit installed. Additional sub- <br />base excavation materials shall be paid to the nearest tenth cubic yard. <br />vii. Asphalt replacement must be IN-KIND. <br />C. Hours of Construction <br />i. Contractor shall perform services from 7:30 a.m. to 4 p.m., Monday through <br />Friday. Work outside of these hours, also known as “off-peak hours,” shall be <br />authorized in writing by the Right-of-Way Utilities Field Supervisor or designee. <br />ii. Contractor shall not schedule construction activities on holidays and/or <br />weekends and other City declared holidays. <br />D. Contractor shall notify property owners of upcoming work at their location. <br />i. Contractor shall post "No Parking" signs at least seventy-two (72) hours prior to <br />the start of work. Signs shall be furnished by the City. <br />ii. Contractor shall provide written notification to residents, businesses, or others <br />located immediately adjacent to a work site seven (7) days prior to the start of <br />work. <br />E. Contractor shall prepare and secure sites at end of each workday at various <br />locations throughout the City. <br />i. The Contractor shall keep the sidewalk open at all times unless a trench location <br />makes closure unavoidable, in which case the sidewalk may be closed while <br />working. The Contractor shall make provisions for pedestrian access if sidewalk <br />is closed. Open trenches are not allowed overnight. Steel plating with cut back <br />shall be installed until temporary surfacing can be constructed. <br />ii. The Contractor shall maintain access to all driveways, except when actually <br />doing construction within the driveway boundaries, at which time, partial access <br />will be maintained unless alternate arrangements can be made with the property <br />owners or tenants in advance. At all times, the Contractor shall provide safe and <br />adequate passage for vehicular and pedestrian traffic through, around and <br />adjacent to all construction operations by use of detours, signs, cones, traffic <br />barriers, flaggers, bridging or other City approved means. <br />iii. No work shall proceed on a site unless temporary barriers, fences, gates and <br />protection are installed and functioning. <br />iv. Contractor shall be responsible for supplying, placing, and maintaining all <br />construction signs, lighted barricades, cones, and other related traffic safety <br />ATTY/AGR.2022-Amend No. 2/Bay Area Paving Co., Inc. (Page 6 of 9)
The URL can be used to link to this page
Your browser does not support the video tag.