Laserfiche WebLink
REV: 02-18-2022 RL <br />equipment to assure the safety of motorists as well as pedestrians. Contractor <br />agrees that it will assume sole and complete responsibility for job site conditions <br />during the course of construction, including safety of all persons and property, <br />and that this requirement shall apply continuously and not be limited to normal <br />working hours. <br />v. All materials and substances shall be disposed of at the Contractor's expense <br />and shall be included as part of the item price. Hazardous materials and <br />substances shall be disposed of in accordance with all applicable state, federal, <br />and city requirements. <br />vi. Contractor shall execute final cleaning prior to final inspection which includes, <br />but is not limited to: removing grease, dust, dirt, stains, labels, fingerprints and <br />other foreign materials from exposed finished surfaces, repairing, patching, and <br />touching up marred surfaces to match adjacent finishes, mechanically sweeping <br />paved areas, and removing waste and surplus materials, rubbish and <br />construction items from a site. The cleaning of equipment or materials shall not <br />be performed on-site or in the street using soaps, solvents, degreasers, steam <br />cleaning or equivalent methods. All cleanup must be performed in a designated <br />area that will not allow the cleaning rinse to flow off-site or into streets, gutters, <br />storm drains, or creeks. <br />F. Final inspection and Guarantees <br />i. At least five (5) City business days' notice shall be given to the Right-of-Way <br />Utilities Field Supervisor or designee that a project is ready for final inspection, <br />that the Contractor has carefully inspected all portions of the work and that all is <br />correct. <br />ii. Upon notice that the work is ready for final inspection, the Right-of-Way Utilities <br />Field Supervisor or designee together with the Contractor, shall promptly make <br />a joint inspection of the work and note deficiencies, if any. If there are no <br />deficiencies, or when noted deficiencies have been corrected and Right-of-Way <br />Utilities Field Supervisor or designee finds the work acceptable, then the work <br />can be considered completed. <br />iii. Contractor shall guarantee for one full year (365 days) from date of acceptance <br />of completed work and acceptance thereof by the City, to repair or replace any <br />improvements that constitute defects resulting from the use of inferior or <br />defective materials, equipment or workmanship. <br />G. Protection of public and private property, utilities, trees, and storm water <br />i. Contractor at its expense shall remove spillage resulting from hauling operations <br />along or across any public traveled way immediately. <br />ii. Contractor shall take appropriate steps such as watering to prevent airborne dust <br />due to work under this Agreement. Contractor shall remove and dispose daily at <br />its cost, site of: debris, waste and rubbish from the work area and the <br />construction site. Contractor shall supply its own water. <br />ATTY/AGR.2022-Amend No. 2/Bay Area Paving Co., Inc. (Page 7 of 9)