My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt19 Bay Area Paving
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2019
>
Agmt19 Bay Area Paving
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2022 3:32:22 PM
Creation date
4/19/2019 2:04:37 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Bay Area Paving, Inc.
PROJECT NAME
ADA Sidelwalk ramps
RMP File Number
304
Date
3/18/2019
MO Ref
19-042
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Exhibit "A" <br />SCOPE OF WORK <br />Contractor's services will consist of removal and replacement of concrete sidewalk, curb <br />and gutter, asphalt pavement, removal of concrete and installation of ADA -compliant curb <br />ramps (ADA ramps), utility trench/street repair and similar work on an as -needed basis. <br />Contractor will provide all labor, materials, disposal, equipment, traffic control and <br />apparatus not specifically mentioned in this Agreement, but which are necessary to <br />complete the services specified herein. <br />Contractor shall have daily communication with the City's project manager. The City's <br />project manager shall assign Contractor work, which Contractor shall complete within <br />twenty-one (21) City business days from the date of the assignment. <br />Contractor shall comply with all City's Engineering Standards, including, but not limited <br />to, Volumes 1, 2 and 3. The City's Engineering Standards can be found here: <br />https://www.redwoodcity.org/departments/commu nity-development- <br />department/engineering-transportation/engineering/engineering-standards <br />Contractor also shall comply with Caltrans and County standards as applicable to work <br />assigned. <br />A. Contractor shall demolish existing sidewalks, asphalt, curbs/gutters, and ADA <br />ramps. <br />Work shall include the saw cutting, removal and disposal of the particular <br />concrete/asphalt item specified, and shall include the base and all its <br />appurtenances to the appropriate depth below finished grade for the thickness of <br />the concrete item, plus four inches thick base rock. Concrete removal shall <br />include any thickness of concrete encountered during excavation. Sites may <br />require greater or lesser excavation and greater tree root removal, if the existing <br />grade has been raised above or settled below final grade. Where sidewalks or <br />curb and gutter are relocated for ADA ramp installation, additional excavation <br />may be required. Where root pruning is required, the sidewalk shall be removed <br />and excavation shall not occur until after root cutting is performed. <br />Concrete removal shall be done in a manner to avoid chipping and breakage of <br />remaining concrete at the conform line. Temporary asphalt ramps or patches on <br />concrete adjacent to repairs shall be removed to the original concrete surface. If <br />concrete is chipped, the existing sidewalk shall either be re -saw cut adjacent to <br />the chip or at the nearest score line at the decision of the City's project manager. <br />Additional concrete repairs necessary due to chipping caused by the Contractor <br />shall be made at the Contractor's expense. <br />iii. The Contractor shall be responsible for pruning any roots or branches from City <br />street trees only at the direction of the Public Works Tree Supervisor or designee. <br />Tree roots shall be removed only as directed by the City's project manager. Tree <br />REV: 02-03-20 MI <br />ATN/AGR.Amend. No. 1/Bay Area Paving Co., Inc. (Page 3 of 7) <br />
The URL can be used to link to this page
Your browser does not support the video tag.