My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2019-04-22 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2019
>
AgdaPkt 2019-04-22 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2019 7:49:21 AM
Creation date
4/19/2019 5:03:45 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
4/22/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
399
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.A. - Page 16 of 16 <br />TABLE B-1 <br />"Fee Schedule" <br />Fees - Level of Effort - Allocation of Resources <br />Construction Tasks <br />Personnel <br />Rate {$) <br />No. of <br />Site <br />Visits <br />Estimated <br />Hours per <br />Visit <br />Estimated <br />Total <br />Hours)Test <br />s <br />Task <br />Subtotals <br />Meetin slConsultation <br />Sr, Prin. Eng. <br />$275.00 <br />2 <br />3 <br />6 <br />$1 650.00 <br />Meetin slConsultation <br />Pro . Geola ist <br />$210.00 <br />2 <br />4 <br />6 <br />$1,680,00 <br />Mass Gradin hillside <br />En . Tech <br />$160.00 <br />12 <br />8 <br />96 <br />$1536000 <br />Mass Gradin (roughgrading) <br />End. Tech <br />$160.00 <br />8 <br />8 <br />64 <br />$1024000 <br />Mass Gradin overtime <br />En . Tech <br />$240.00 <br />12 <br />1 <br />12 <br />$2,880.00 <br />Aoorecate Pier InstallfTestnq <br />Staff Eng. <br />$165.00 <br />8 <br />8 <br />64 <br />$17560.00 <br />A re ate Pier Overtime <br />Staff Eng. <br />$247.50 <br />8 <br />2 <br />16 <br />$3,960.00 <br />Soil Nail InstallationfTestina <br />Staff Ena. <br />$165.00 <br />11 <br />8 <br />88 <br />$14,520.00 <br />Soil Nail Overtime <br />Staff Eng. <br />$247.50 <br />11 <br />1 <br />11 <br />$2,722.50 <br />Spread Footing Excavations <br />Staff Eng. ----$165.00 <br />10 <br />2 <br />20 <br />$31300M <br />Observe Subdrain <br />Enq. Tech <br />$160.00 <br />3 <br />2 <br />6 <br />$960.00 <br />Densi Tests <br />$10.00 <br />180 <br />$1800M <br />Trucks <br />$17.00 <br />391 <br />$6 647.00 <br />Office Tasks <br />management; correspondence <br />with design team and <br />applicable agencies; <br />miscellaneous consultation; <br />Sr. Prin. Eng. <br />Prin. Const. Eng. <br />Sen Sup. Tech. <br />Staff Eng, <br />Const. Ser. Admin <br />$275.00 <br />$190.00 <br />$170.00 <br />$165.00 <br />$115.00 <br />20 <br />15 <br />22 <br />6 <br />20 <br />$5,500.00 <br />$2,850,00 <br />$3,740.00 <br />$990.00 <br />$.2,300.00 <br />Laboratory Tests <br />Compaction <br />$310.00 <br />3 <br />$930.00 <br />Moisture Content <br />$6.00 <br />25 <br />$150.00 <br />Plasticity Index <br />MOQ <br />1 <br />$220.00 <br />Total Cost <br />$92,980 <br />REV: 04-09-19 DZ <br />Page 12 of 12 <br />ATfYIAGR.2019.080 /Cornerstone Earth Group, Inc. <br />23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.