My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2019-04-22 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2019
>
AgdaPkt 2019-04-22 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2019 7:49:21 AM
Creation date
4/19/2019 5:03:45 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
4/22/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
399
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
9.C. - Page 14 of 30 <br />The mechanism shall include criteria for prioritization (e.g. specific logistical constraints, water <br />quality drivers (e.g. TMDLs), opportunities to treat runoff from private parcels in retrofitted <br />street right-of-way) and outputs (e.g. maps, project lists) that can be incorporated into the <br />Permittee's long-term planning and capital improvement processes. <br />Provision C.3 j.i. (2)(b): Outputs from the mechanism described above, including, but not <br />limited to, the prioritization criteria, maps, lists, and all other information, as appropriate. <br />Individual project -specific reviews completed using these mechanisms are not required to be <br />submitted with the Plan, but shall be made available upon request. <br />Provision C.3 j.i, (2)(c): Targets for the amount of impervious surface, from public and private <br />projects, within the Permittee's jurisdiction to be retrofitted over the following time schedules, <br />which are consistent with the timeframes for assessing load reductions specified in Provisions <br />C.11. and C.12. <br />A.1 Work with C/CAG to develop GIS -based modeling tool for use in mapping, prioritizing, <br />and phasing of potential and planned projects <br />A.1.2 Further develop and <br />populate the tool with GIS <br />developed through the <br />Reasonable Assurance Analysis <br />(RAA) to address mercury and <br />PCBs TMDL implementation. <br />Primary: <br />Consultants and <br />C/CAG <br />Review/Support: <br />Member Agencies <br />Work began in the second half of FY 15- <br />16. <br />The Stormwater resource plan was <br />completed in February 2017. <br />Resulting GIS was added to the tool in <br />the second half of FY 16-17. <br />A.1.3 Web -based GIS tool' made Primary: Tool was released in June 2016, with GIS <br />available for on-going use of Consultants and added resulting from the RAA to support <br />C/CAG member agencies. C/CAG GI added in the second half of FY 16-17. <br />A.2 Develop prioritization criteria for GI project opportunities. <br />A.2.1 Preliminary criteria Primary: <br />established as part of the SRP. Consultants and SRP completed in February 2017. <br />C/CAG <br />' As currently planned, this tool would allow for viewing of mapping and data. This tool will be accessible <br />via the internet, and will not require a local GTS platform for a Member Agency to view GIS layers. <br />REV: 05-15-17 PR <br />Page 4 of 17 <br />292 <br />Primary: <br />A.1.1 Initiate development of <br />Consultants and <br />the tool as part of the San <br />C/CAG <br />Mateo County Stormwater <br />Review: Member <br />Resources Plan (SRP). <br />Agencies <br />A.1.2 Further develop and <br />populate the tool with GIS <br />developed through the <br />Reasonable Assurance Analysis <br />(RAA) to address mercury and <br />PCBs TMDL implementation. <br />Primary: <br />Consultants and <br />C/CAG <br />Review/Support: <br />Member Agencies <br />Work began in the second half of FY 15- <br />16. <br />The Stormwater resource plan was <br />completed in February 2017. <br />Resulting GIS was added to the tool in <br />the second half of FY 16-17. <br />A.1.3 Web -based GIS tool' made Primary: Tool was released in June 2016, with GIS <br />available for on-going use of Consultants and added resulting from the RAA to support <br />C/CAG member agencies. C/CAG GI added in the second half of FY 16-17. <br />A.2 Develop prioritization criteria for GI project opportunities. <br />A.2.1 Preliminary criteria Primary: <br />established as part of the SRP. Consultants and SRP completed in February 2017. <br />C/CAG <br />' As currently planned, this tool would allow for viewing of mapping and data. This tool will be accessible <br />via the internet, and will not require a local GTS platform for a Member Agency to view GIS layers. <br />REV: 05-15-17 PR <br />Page 4 of 17 <br />292 <br />
The URL can be used to link to this page
Your browser does not support the video tag.