Laserfiche WebLink
9.C. - Page 20 of 30 <br />D.1 Work through C/CAG and its GI TAC to coordinate with the Bay Area Stormwater <br />Management Agencies Association (BASMAA) Development Committee's work on a single <br />approach for how to proceed should project constraints preclude fully meeting the C.3.d sizing <br />requirements. <br />Primary: <br />D.1.1 Review BASMAA draft recommendations on Consultants and Consultants and C/CAG <br />single approach, not related to hydromodification, C/CAG review, est. April 2017. <br />through C/CAG GI TAC; provide comments to Review: TAC review, est. June <br />BASMAA and their consultant. Member 2017. <br />Agencies <br />Primary: Consultants and C/CAG <br />D.1.2 Review BASMAA draft recommendations on Consultants and review, est. mid-March <br />single approach, related to hydromodification, C/CAG thru April 2018. <br />through C/CAG GI TAC; provide comments to Review: <br />BASMAA and their consultant. Member TAC review, est. May <br />Agencies 2018. <br />D.1.3 Integrate final single approach from BASMAA Primary. Begin in est. August <br />into model GI Plan. Member 2018. <br />Agencies <br />E. Planning document update, summary of updates, and workplan for future plans <br />This work covers the needs of two provisions of the MRP: <br />Provision C.3 j.i.(2)(h): A summary of the planning documents the Permittee has updated or <br />otherwise modified to appropriately incorporate green infrastructure requirements... Permittees <br />are expected to complete these modifications as a part of completing the Green Infrastructure <br />Plan, and by not later than the end of the permit term. <br />Provision C.3 j.i.(2)(i): To the extent not addressed above [in (h)], a workplan identifying how <br />the Permittee will ensure that green infrastructure and low impact development measures are <br />appropriately included in future plans (e.g., new or amended versions of the kinds of plans <br />listed above). <br />E.1 Work through C/CAG through the GI TAC to develop model planning document update <br />language. <br />E.1.1 Permittees provide existing Primary: <br />planning documents to C/CAG for Member Task complete. <br />review. Agencies <br />REV: 05-15-17 PR <br />Page 10 of 17 <br />298 <br />