My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2019-04-22 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2019
>
AgdaPkt 2019-04-22 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2019 7:49:21 AM
Creation date
4/19/2019 5:03:45 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
4/22/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
399
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
9.C. - Page 20 of 30 <br />D.1 Work through C/CAG and its GI TAC to coordinate with the Bay Area Stormwater <br />Management Agencies Association (BASMAA) Development Committee's work on a single <br />approach for how to proceed should project constraints preclude fully meeting the C.3.d sizing <br />requirements. <br />Primary: <br />D.1.1 Review BASMAA draft recommendations on Consultants and Consultants and C/CAG <br />single approach, not related to hydromodification, C/CAG review, est. April 2017. <br />through C/CAG GI TAC; provide comments to Review: TAC review, est. June <br />BASMAA and their consultant. Member 2017. <br />Agencies <br />Primary: Consultants and C/CAG <br />D.1.2 Review BASMAA draft recommendations on Consultants and review, est. mid-March <br />single approach, related to hydromodification, C/CAG thru April 2018. <br />through C/CAG GI TAC; provide comments to Review: <br />BASMAA and their consultant. Member TAC review, est. May <br />Agencies 2018. <br />D.1.3 Integrate final single approach from BASMAA Primary. Begin in est. August <br />into model GI Plan. Member 2018. <br />Agencies <br />E. Planning document update, summary of updates, and workplan for future plans <br />This work covers the needs of two provisions of the MRP: <br />Provision C.3 j.i.(2)(h): A summary of the planning documents the Permittee has updated or <br />otherwise modified to appropriately incorporate green infrastructure requirements... Permittees <br />are expected to complete these modifications as a part of completing the Green Infrastructure <br />Plan, and by not later than the end of the permit term. <br />Provision C.3 j.i.(2)(i): To the extent not addressed above [in (h)], a workplan identifying how <br />the Permittee will ensure that green infrastructure and low impact development measures are <br />appropriately included in future plans (e.g., new or amended versions of the kinds of plans <br />listed above). <br />E.1 Work through C/CAG through the GI TAC to develop model planning document update <br />language. <br />E.1.1 Permittees provide existing Primary: <br />planning documents to C/CAG for Member Task complete. <br />review. Agencies <br />REV: 05-15-17 PR <br />Page 10 of 17 <br />298 <br />
The URL can be used to link to this page
Your browser does not support the video tag.