Laserfiche WebLink
9.C. - Page 21 of 30 <br />Primary: <br />E.1.3 Participate in GT TAC meeting <br />Primary: <br />to give direction on refinements to <br />Agencies <br />Completed December 2016. <br />Consultants <br />Draft text prepared late -September thru <br />E.1.2 Prepare and review draft <br />and C/CAG <br />mid-November 2016. <br />model plan update language for <br />priority sample documents. <br />Review: <br />TAC reviewed mid-November thru <br />Member <br />December 2016. <br />Agencies <br />Primary: <br />E.1.3 Participate in GT TAC meeting <br />Member <br />to give direction on refinements to <br />Agencies <br />Completed December 2016. <br />outline for model planning content <br />Facilitation: <br />and resolve comments. <br />Consultants <br />and C/CAG <br />Primary: <br />E.1.4 Prepare and review draft Consultants <br />and C/CAG Prepared full draft early 2017, <br />model planning update materials Review: TAC reviewed March 2017. <br />from C/CAG. Member <br />Agencies <br />: <br />E.1.5 Prepare final draft model PrimaryPrepare final draft June thru November <br />planning update materials. Consultants 2017. <br />and C/CAG <br />E.1.6 Begin utilizing final model <br />planning update materials to revise Primary: Member As needed through Planning Document <br />Permittee -specific documents; see Agencies Updates. <br />below for further details. <br />E.2 Make modifications to Permittee -specific planning documents. <br />E.2.1 Make needed modifications <br />to planning documents that are <br />currently being updated or <br />created, for other purposes, during <br />the preparation of development of <br />model language, to the extent <br />feasible. <br />As needed through Planning Document <br />Primary: <br />Member Updates, as further specified in the <br />Agencies workplan to be prepared under MRP <br />Section C.3.j.i.(2)(i). <br />E.2.2 Draft modifications or As needed through Planning Document <br />updates to each existing planning Primary: Updates, as further specified in the <br />document, needing this effort, to Member <br />appropriately incorporate green Agencies workplan to be prepared under MRP <br />Section C.3 j.i.(2)(i). <br />infrastructure requirements. <br />REV: 05-15-17 PR <br />Page 11 of 17 <br />299 <br />