My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2019-04-22 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2019
>
AgdaPkt 2019-04-22 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2019 7:49:21 AM
Creation date
4/19/2019 5:03:45 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
4/22/2019
Jump to thumbnail
< previous set
next set >
Text box
ID:
1
Creator:
Created:
4/19/2019 5:05 PM
Modified:
4/19/2019 5:05 PM
Text:
http://www.redwoodcity.org/
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
399
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.A. - Page 2 of 16 <br />• Construction of new on-site pipeline between the new water tank and the new pump <br />station on the project site; <br />• Construction of a new 2,000 foot long transmission pipeline from the new tank to an <br />existing pipeline at Jefferson Avenue and Fallen Leaf Way, to serve as pumping line <br />from Lakeview Water Station to the new tank; <br />• Replacement of the existing California Pump Station; and <br />• Installation of a new emergency power generator to service the new pump station <br />On April 8, 2019, City Council awarded the Project construction to Anderson Pacific Engineering <br />Construction, Inc. Construction is expected to begin approximately in two months and be completed <br />within the next two years. <br />Cornerstone Earth Group has participated in this project since the early stages, has been engaged with <br />the City under a separate contract to perform the Geotechnical Investigation, and has contributed with <br />review and recommendations during the design phase of the project. <br />ANALYSIS <br />Cornerstone Earth Group will provide Geotechnical Engineering Services during construction such as <br />observation and testing as necessary for the specific geotechnical tasks outlined below related to the <br />construction of the proposed structures. <br />■ Mass Grading <br />■ Aggregate Pier Installation -Tank Foundation <br />■ Soil Nail Installation - Retaining Wall <br />■ Spread Footing Excavation <br />■ Sub -drain Installation <br />In addition to the observation and testing of the above noted construction activities, the Consultant will <br />perform laboratory testing as necessary to document compliance with the Project Documents to confirm <br />the field observations; and provide consultation as needed for the project. <br />FISCAL IMPACT <br />Funds were previously appropriated in the Fiscal Year 2018-2019 budget and a combined balance of <br />$7,659,950 is available as of March 31, 2019. <br />ENVIRONMENTAL REVIEW <br />The City Council adopted a resolution certifying the Final Environmental Impact Report for the California <br />Way Water Tank, Pump Station and Pipeline Project on May 8th, 2017. <br />City of Redwood City 1017 Middlefield Road, Redwood City, CA. 94063 Tel: 650-780-7000 www.redwoodcity.ore <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.