Laserfiche WebLink
6.1 B <br /> Page 2 <br /> At the bid opening held on August 23, 2006, five (5) bids were received, which are <br /> summarized below: <br /> Rank Contractor Amount <br /> 1 G. Bortolotto � Co., Inc. —San Carios, CA $887 605.39 <br /> 2 C.� Archibald Pavin , Inc. — Redwood Cit , CA $924,231.40 <br /> 3 Granite Rock Co. dba Pavex Construction Division— $969,426.50 <br /> Redwood Ci , CA <br /> 4 O'Grad Pav'rn , Inc. —Mountain View, CA $1,048,867.55 <br /> 5 interstate �radin and Pavin , inc. — So. San �rancisco, CA $1,199,618.05 <br /> The low bid of $8$7,605.39 is 26% higher the Engineer's Estimate of $700,000, <br /> however, it is considered a good and responsive bid. <br /> Altemative <br /> Do not award the contract and defer the needed overiay un#iI a future year. The <br /> candition of these streets will continue to deteriorate, and the cost to rehabilitate the <br /> pavement wi11 continue to escalate at a higher ra#e, as the pavement continues to <br /> deteriorate. <br /> Fiscal Impacts <br /> This project wilf be partialiy funded by a Federa(-aid Transportation grant uncier the <br /> SurFace Tr�nsportation Program (STP}. The STP has obligated $365,000 in funding for <br /> this project. Sufficient funds are appropriated in the Capital Impravement Program <br /> budget as part of the Gas Tax Construction and Transportation {Measure "A) Funds for <br /> the remaining amount ($522,605). � <br /> M. Saber Sarwa , P.E. Chu Chang, P.E. <br /> Senior Civil Engineer Manager, Engineering & Construction <br /> �---� � � <br /> ' ,�� � ,�' _... <br /> ; , ���;�� <br /> u�,�,, , <br /> Peter Ingram Ed E erett <br /> Community Development Director City Manager <br /> PI/PD:ss <br /> S/library/reports/award_2005-2006�verlay Project <br /> Page 2 of 2 <br /> . . __ �.__ _ <br />