My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt06 ITT Industries - Flygt Submersible Pump Maint. & Repair
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2006
>
Agmt06 Under $60K
>
Agmt06 ITT Industries - Flygt Submersible Pump Maint. & Repair
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2008 11:12:35 AM
Creation date
10/2/2006 10:40:16 AM
Metadata
Fields
Template:
Agreement
Contractor Name
ITT Industries
PROJECT NAME
Storm Sys. Pump Stations - Flygt Submersible Pump Maint. & Repair
RMP File Number
304
Date
10/2/2006
Box
6586
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />EXHIBIT - A <br /> <br />~ITT Industries <br /> <br />ITT Flygt Corporation <br />790-A Chadbourne Road <br />FairfieJd;"CA 94534 <br />Tel: (707) 422-9894 <br />Fax: (707) 422-9808 <br /> <br />SCHEDULED PUMP PREVENTATIVE MAINTENANCE INSPECTION AGREEMENT <br />FLYGT CORPORATION <br /> <br />SERVICE - 21 POINT CHECK LIST <br /> <br />CJ Check electrical condition of insulation on power cable and on'all phases of motor. (In Meg Ohms) <br /> <br />CJ Check for any loose or faulty electrical connections within the pump control panel. <br /> <br />CJ Measure resistance between stator windings. (In Ohms) <br /> <br />CJ Check voltage supply between all phases of the electrical control panel. (V AC) <br /> <br />CJ Check voltage balance between all phases on the load side* of the pump control with pump on. (V AC) <br /> <br />CJ Check amperage draws on all phases of the pump motor. (In Amps) <br /> <br />CJ Check condition and operation of motor thermal protectors control system (if so equipped). <br /> <br />CJ Removal ofFlygt pump from lift station for physical inspection. <br /> <br />CJ Check condition of upper shaft seals (inspect condition of motor housing). <br /> <br />CJ Check condition and operation of leakage detector (if so equipped). <br /> <br />CJ Check lower shaft seals (inspect condition of oil). <br /> <br />o Change oil if needed (cost of oil included). <br /> <br />o Check for worn or loose impeller. <br /> <br />CJ Check all impeller wear rings. (Note: Wear rings are not covered by warranty and must be purchased by <br />customer ifin need of replacement) <br /> <br />CJ Check for noise upper and lower bearings. <br /> <br />CJ Check physically for damage of pump and power cable. <br /> <br />CJ Clean, reset, and check operation of level sensors. <br /> <br />o Check for correct shaft rotation. <br /> <br />o Reinstall Flygt pump and check for leakage at the discharge connection. <br /> <br />o Test of pump operation cycle (ifleve1 ofliquid in station permits). <br /> <br />o Check operating of valves and pipes in station. <br /> <br />F~ <br /> <br />Exhibit A - Scope of Services <br />Storm Pumps & Motors <br />
The URL can be used to link to this page
Your browser does not support the video tag.