My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Ord65 1219
RedwoodCity
>
City Clerk
>
Ordinances
>
1960-1969 partial
>
1965
>
Ord65 1219
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2008 12:22:02 PM
Creation date
11/13/2006 5:05:20 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Ordinance
Date
10/19/1965
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />supplying utility shall furnish that portion of the conduits, <br />conductors and associated equipment required to be furnished <br />by it under its applicable rules, regulations and tariffs on <br />file with the Commission. Underground construction by the <br />utility shall be accomplished in accordance with established <br />construction standards and in accordance with the rules and <br />regulations authorized by the Commission. <br />"Section 11. 49 (a) All underground construction and <br />conduits, conductors and associated equipment necessary to <br />receive utility service between the service facilities referred <br />to in section 11.48 and the service facilities in the building <br />or structure being served shall be provided by the person own- <br />ing, operating, leasing, or renting said property, subject to <br />applicable rules, regulations and tariffs of the respective <br />utility or utilities on file with the Commission and to the <br />lawful requirements of state laws and City ordinances. <br />"(b) In the event the person owning, operating, leasing <br />or renting said property does not comply with the provisions of <br />paragraph (a), above, within the time specified in the ordinance <br />adopted pursuant to Section 11.45, the City Engineer shall post <br />written notice on the property being served and 30 days thereafter <br />shall have the authority to order the disconnection and removal <br />of any and all overhead service wires and associated facilities <br />supplying utility service to said property. <br />"Sect ion 11. 50 The City shall remove or cause the removal <br />of its police and fire alarm circuits or any similar municipal <br />equipment from all poles required to be removed by this article <br />during the time period established for the utility company to <br />remove such poles. <br />"DIVISION 3. NEW CONSTRUCTION <br />"Sect ion 11. 55 No permit shall be issued by the Building <br />Inspector for any new building or structure to be constructed in <br />- 6 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.