Laserfiche WebLink
<br />EXHIBIT "A" <br /> <br />..... <br /> <br />V&A <br /> <br />1999 <br /> <br /> <br /> <br />Oakland. C/". 94612 <br /> <br />'Jdengii":eenng curn <br /> <br />November 30,2006 <br /> <br />Ms. Grace Le <br />Associate Engineer <br />City of Redwood City <br />1017 Middlefield Road <br />Redwood City, CA 94063 <br /> <br />SUBJECT: <br /> <br />Proposal for Wastewater Flow Monitoring Services <br /> <br />Dear Ms. Le, <br /> <br />As per our discussion, the following is our letter proposal and detailed scope of work for the subject <br />services: <br /> <br />SCOPE OF WORK <br /> <br />The following is our detailed scope of work for the project services. This scope of work was developed as <br />a result of our review of the request for proposal and represents our mutual understanding. <br /> <br />Task Description <br /> <br />1. Field Reconnaissance and Document Review: V&A will review available plans and documents, and <br />conduct field reconnaissance of the proposed flow monitoring sites identified by the City. The purpose <br />of the reconnaissance will be to assess hydraulic conditions, manhole access, traffic control <br />requirements, and safety issues for each site. Any modifications to the proposed meter sites will be <br />submitted to the City for review and approval by the City. Deliverable: Documentation of site <br />reconnaissance and final flow monitoring sites will be submitted to the City within 3 days after site <br />reconnaissance. <br /> <br />2. Installation I Calibration I Maintenance I Removal of Flow Monitors: V&A will install 12 flow <br />meters and one rain gauge for a period of 60 days starting no later than December 4, 2006, with an <br />option to extend the monitoring on a weekly basis up to one additional month. The flow meters will be <br />area-velocity type capable of measuring flows and flow depths under surcharge conditions. Pipe <br />diameters will range from approximately 15 to 33 inches. Rain gauges will be tipping bucket type <br />capable of recording to 0.01 inches. <br /> <br />V&A will be responsible for taking all necessary safety precautions in the performance of the work, <br />following all applicable Federal, State, and local regulations for working in confined spaces, and <br />complying with all applicable traffic control requirements of the City or other agencies with jurisdiction <br />over the meter sites. <br /> <br />The flow meters and rain gauges will be installed at the approved sites and visited weekly during the <br />monitoring period. V&A shall report to the City or City's master plan consultant within 24 hours of <br />each site visit if any meter has malfunctioned or failed to provide good data, or if changes in site <br />conditions have impacted collection of good data. Field calibration data (independent measurements <br />of flow depth and velocity) will be collected throughout the monitoring period for each meter to verify <br />monitor accuracy over a range of flow depths. The monitor data will be collected at 5-minute intervals <br />and reported at 15-minute intervals. The meters will be interrogated at each site visit and the data <br /> <br />OAKLAND HOUSTON <br /> <br />