My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt00 Irvine Apartment Communi
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2000
>
Agmt00 Irvine Apartment Communi
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2012 11:49:51 AM
Creation date
10/22/2002 9:23:14 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Irvine Apartment Communities
PROJECT NAME
Franklin Street project
RMP File Number
304
Date
2/15/2001
Reso Ref
RD-00-53, RD 99-30
Amendment
Yes
Box
6150
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• ATTACHMENT 6(a) <br /> Brian Kangas Foulk <br /> Engineers . Surveyors . Planners <br /> Description of Shared Infrastructure <br /> Irrin�Annrtnrent Conrmunities and Shea Hnmes—All Pl7ases (nt btrildorit) <br /> I. Maple Street � <br /> • �Reconstruct Maple Street bet�veen EI Camino Real and tl�e Joint Powers Board's <br /> CalTrain right-of-way. <br /> • Realign Maple Street at its intersection �vitli El Camino Real. <br /> • Close and barricade Lathrop Street at the intersection with Maple Street. <br /> • Provide a dedicated right and left turn lane on Maple Street at the �1 Camino intersection <br /> and provide a dedicated left turn lane from Maple Street onto Pranklin Street. <br /> II. Franklin Street <br /> • Relocate Franklin Street between Maple Street and Monroe Street. <br /> • Replace and narro�v Franl:lin Street bet�veen Monroe Street atid Jefferson Street. <br /> • Modify the pedestrian crossing at tlie intersection of Franklin Street and Jeffersorl Street. <br /> III. El Camino Real <br /> • Modify the traffic si�nal medians and si�ning and stripin� at the intersection of E1 <br /> Camino and the realigned Maple Street. <br /> • Install frontage improvements oii EI Ca►niilo bet���een Maple Street and Jefferson Street. <br /> • Construct new curb cuts at the private street connectin� to the Bekins buildin� and <br /> Building 1 A parkin� garage. <br /> • Construct new curb cut at the ne�v private streets (Madison and Jacl:son). Provide <br /> medians to allo�v rigllt turn in and out of Madison, wliile coiltinuing to allow and <br /> accommodate left turns from El Camino onto tlie soutli leg of Madison Street and from <br /> soutli Madison Street onto El Camino. <br /> IV. Public Underground Utilities <br /> A. Storm Drainage. <br /> � Install trunk line from the Red�vood Creek outfall near Maple Street to the relocated <br /> Franklin Street. <br /> • Continue the trunk line in Franklin Street, Madison Street and Jackson Street. <br /> Accommodate and connect off-site piping at Madison Street. <br /> 540 Price Avenue • Redwood City,CA 94063 • �650)482-6300 • FAX(650)482-6399 <br /> Me nf Fnur <br />
The URL can be used to link to this page
Your browser does not support the video tag.